User's Manual

Table Of Contents
18
Installing the Cisco LoRaWAN Interface Module
Mounting the Device
The Console-Reset port and the Reset button are under a hex-shaped sealed plug. Inspect the seal of the plug and
properly tighten it at the time of installation, and also every time the plug is removed and replaced. Tighten the plug
to 15 lbf-in. If you do not tighten the plug properly, it will not meet IP67 criteria, and may lead to water leaking into
the unit.
Figure 1 Connecting Console Port and USB port
If the DC power port, LAN port, or the PoE-In port is not in use, the port’s covering plug must be tightened to 12.5
in-lbs (1.41 N-m) torque. Otherwise, it may lead to water leaking into the Cisco LoRaWAN Interface Module.
To calculate path loss and to determine how far apart to install Cisco LoRaWAN Interface Modules, consult an RF planning
expert.
Mounting the Device
This section provides instructions for installing your access points. Personnel installing the access point must understand
wireless Cisco LoRaWAN Interface Modules and bridging techniques and grounding methods.
Caution: All installation methods for mounting an Cisco LoRaWAN Interface Module on any wall surface is subject to the
acceptance of local jurisdiction.
Installation Options
The Cisco LoRaWAN Interface Module can be pole or wall mounted by using the mounting kit (AIR-ACC1530-PMK1=).
Warning: Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Statement 1030
Warning: Installation of the equipment must comply with local and national electrical codes. Statement 1074
Mounting Orientation
When mounting an Cisco LoRaWAN Interface Module on a vertical surface, you must ensure that the Cisco LoRaWAN
Interface Module is oriented with the LED indicators pointing down. This positioning allows LEDs to be visible to someone
on the ground below the Cisco LoRaWAN Interface Module.