User's Manual

Table Of Contents
38
Installing the Cisco LoRaWAN Interface Module
Powering the Cisco LoRaWAN Interface Module
Figure 15 DC Power Port and Ethernet Port Opening in the Cisco LoRaWAN Interface Module Case
9. Slide the cable gland with the rubber seal towards the Cisco LoRaWAN Interface Module, and screw the threaded
end of the body into the Cisco LoRaWAN Interface Module, and hand-tighten.
10. Use an adjustable wrench, a 28-mm wrench to tighten the threaded end of the body to 15 in-lbs (1.69 N-m).
11. Use an adjustable wrench and tighten the thread-lock seal nut to 15 in-lbs (1.69 N-m).
12. Ensure that the antennas are connected to the Cisco LoRaWAN Interface Module before you apply power to the
Cisco LoRaWAN Interface Module.
13. Turn on the DC power at the designated circuits.