ATM Switch Installation Guide

2-4 Cisco LightStream 100 User Guide
Installation Environmental Conditions
Installation Environmental Conditions
Install the LightStream 100 ATM switch in an area that meets the following conditions:
1 Make sure the LightStream 100 switch remains operational within the temperature and
humidity limits shown in Table 1-3.
2 Allow the following minimum vacant space surrounding the LightStream 100 switch to
ensure proper heat radiation:
10 cm (approximately 4 inches) or more—sides
10 cm (approximately 4 inches) or more—front and rear
10 cm (approximately 4 inches) or more—top
3 Make sure the installation site meets the following criteria:
Protected from water and chemicals
Free of shock and vibration
Horizontal
Free of excessive dust
Away from direct sunlight
Away from devices that generate strong magnetism (for example, a TV or speakers)
Confirming the Contents of the Shipping Container
This section provides information about the contents of containers used to transport the
LightStream 100 ATM switch.
The LightStream 100 switch comes in two containers: the LightStream 100 main unit
container and the LINF card container. Ensure that the containers are labeled with each type
of equipment before opening them.
The LightStream 100 main unit includes the following parts:
Motherboard (P-8X84)
Bus converter (BCONV) card (P-8X54)