Ripwave 2.6 GHz Base Station Hardware Installation and Commissioning Guide Version 1.0.
Ripwave 2.6 GHz Base Station Installation and Commissioning Guide ii Navini Networks, Inc.
Ripwave 2.6 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc. TABLE OF CONTENTS REGULATORY INFORMATION ............................................................................................ VII SAFETY.......................................................................................................................................VIII Introduction.........................................................................................Error! Bookmark not defined.
Ripwave 2.6 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc. Sweeping the Individual Cables ...............................................Error! Bookmark not defined. Installing the BTS Mounting Rack and/or Enclosure...................Error! Bookmark not defined. Installing the BTS Power Supply and Batteries............................Error! Bookmark not defined. Installing the Power Supply......................................................Error! Bookmark not defined.
Ripwave 2.6 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc. Calibration of the BTS .......................................................................Error! Bookmark not defined. RF Sanity Test.....................................................................................Error! Bookmark not defined. Equipment Required .....................................................................Error! Bookmark not defined. Loss Procedure for Test Cable.........................
Ripwave 2.6 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc. Permissions, trademarks, and distribution Copyright © November 2001 - 2002, Navini Networks, Inc. All information contained herein and disclosed by this document is confidential and the proprietary property of Navini Networks, Inc. and all rights therein are expressly reserved.
Ripwave 2.6 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc. Regulatory Information FCC Compliance and Advisory Statement This equipment has been tested and found to comply with the limits for a class A digital device, Pursuant to Part 15 of the FCC rules.
Ripwave 2.6 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc. Safety To optimize safety and expedite installation and service, read this document thoroughly. Follow all warnings, cautions, and instructions marked on the equipment and/or included in this document. Navini Networks, Inc. expressly requires that only technically qualified and authorized personnel be allowed to install, service, or operate the equipment.
Ripwave 2.6 GHz Base Station Installation and Commissioning Guide Navini Networks, Inc. Symbols Throughout this manual, the following symbols are used to designate precautions that need to be taken when performing the step. For your safety and protection of the equipment, observe these precautions when installing, operating, or servicing the equipment. Caution Symbol This symbol indicates a potentially hazardous situation that may result in equipment damage or improper operation.