Chapter 2 Preparing for Installation
Safety Steps
2-6
Cisco Metro 1500 Series Hardware Installation Guide
78-10588-03
Customer Checklist
Use the following checklist to ensure that the site is ready for installation:
Does each unit have the specified access clearance?
Is each unit within 5 feet (1.5 m) of power receptacles?
Are required fiber-optic cables available and clearly labeled?
Are floor tile cutouts for cable access the right size?
Has cable routing been determined and performed?
Have personnel been allocated for installation and testing?
Has interface cable installation been arranged?
Has pilot online testing been formulated?
Does site meet temperature and humidity specifications?
Safety Steps
To assure correct and reliable operation of the system, be sure to follow all
warning and caution marks in this guide.
If any problems occur, stop operating the system and follow these steps:
Step 1 Turn the keyswitch to the off position.
Step 2 Disconnect the power cords at the rear of the unit.
Step 3 Call your customer service representative.
System Environment
Being careful to avoid humidity and dust, install the system horizontally in a clean
environment. Air conditioning is required. Do not expose the system to direct
sunlight or heat sources. Locate the system in a restricted area.