User Manual

Navini Networks, Inc. Base Station User Manual
A
8 - Develop a Bill of Materials (BoM).
<Customer >
9 - Acquire the materials. <Customer>
Sample BoM
Antenna Power & Cable
Selection Procedure &
Form
7 - Antenna Power & Cable selection.
10 - Confirm the customer backhaul, EMS
Server, FTP Server, input power and
grounding are installed and operational at site.
6 - Complete the Network Architecture design.
<Network Planning>
Phase I: Pre-installation - Site Selection, Design & Preparation, continued
Part #40-00047-01 Rev C v1.0 (1.20) 21
September 26, 2003