User Manual
Table Of Contents
Base Station User Manual Navini Networks, Inc.
17 - If required in the Responsibility
Assignment Matrix (RAM) portion of the
Project Plan, test the backhaul to the customer
demarcation point.
18 - Provide a printed package of the measured
results and equipment inventory to the
customer on-site.
B
19 - Go over the results using the printed
p
ackage and obtain customer sign-off on the
completion of the Installation portion of the
work. Use the Base Station Installation
Certification Form for sign-off (same form as
Ste
p
15
,
A
pp
endix T
)
.
Installation, continued
24 Part #40-00197-00 Rev C v1.0 (1.20)
September 26, 2003










