User Manual
Table Of Contents
Navini Networks, Inc. Base Station User Manual
24b - Perform full Drive Study, and
record the results on the Drive Study
Form. This is used for tuning the
model (same form as Step 19,
Appendix X).
25 - Perform full LOS Location (FTP) Test.
Record the results (same form as Step 20,
Appendix Y).
26 - Perform full NLOS Location (FTP) Test.
Record the results (same form as Step 20,
Appendix Y).
Site Installation
Closeout
Documentation
Customer
Acceptance Form
31 - Participate in the Customer sign-off of the
Customer Acceptance Form
.
30 - Gather all required documents & forms to
create a delivery package for the Customer sign-
off and for the Navini Techical Support database.
See Installation Closeout Documentation
.
29 - Back up the EMS database.
28 - Verify system operation with multiple
Modems in use.
27 - Send test results to Navini Technical
Support.
E
Commissioning, continued
Part #40-00047-01 Rev C v1.0 (1.20) 29
September 26, 2003










