Installation guide
Index
IN-3
Catalyst 3560 Switch Hardware Installation Guide
OL-6337-03
I
installation
assigning the IP Address
C-6
connecting to a power source C-5
rack-mounting 2-7 to 2-11
shelf-mounting 2-15
site requirements 2-4
starting the terminal emulation software C-4
table-mounting 2-15
wall-mounting 2-12
See also procedures
installing SFP modules
2-16 to 2-17
L
LEDs
color meanings
1-11
duplex 1-11
front panel 1-10
interpreting 1-11
port 1-11
port mode 1-11 to 1-13
POST results 3-1, C-5
Power over Ethernet 1-11
RPS 1-11
speed 1-11
STATUS 1-11
system 1-10
M
Mode button 1-9
mounting, shelf 2-15
mounting, table 2-15
mounting, wall-mounting 2-12
mounting brackets
attaching
2-9 to 2-11
rack-mount 2-11
N
network configuration examples 1-1
noise, electrical 2-5
P
packing list 2-6
performance problems, solving 3-1
pinouts
10/100/1000 ports
B-2
10/100 ports B-3
adapters B-5
console port B-6, B-6
crossover cable B-5
crossover cables
four twisted-pair, 1000BASE-T ports
B-5
two twisted-pair 10/100 ports B-4
RJ-45-to-DB-25 terminal adapter B-6
RJ-45-to-DB-9 terminal adapter B-6
SFP module ports B-3
straight-through cables
four twisted-pair 1000BASE-T ports
B-4
two twisted-pair B-4
PoE 1-6
high-powered devices 1-7
LED 1-12
port LEDs 1-11
port modes
changing
1-9
LEDs 1-11
See also Mode button
ports
10/100
1-2, 1-6
pinouts B-2
10/100/1000 1-6, B-2
pinouts B-2
numbering of 10/100 1-6










