CSBBYMV CAB438C CAB438C WARNING Read and understand these instructions before operating or servicing these machines. Keep These Instructions for Future Reference. (If this machine changes ownership, this manual must accompany machine.) An LSG Company 831 South First Street, P.O. Box 32270 Louisville, KY 40232-2270 Phone: (502) 587-1292 Sales Fax: (502) 585-3625 Service/Parts Fax: (502) 681-1275 www.cissellmfg.com Part No.
Table of Contents Safety Information.............................................................................. Explanation of Safety Messages........................................................... Important Safety Instructions ............................................................... 3 3 3 Operation............................................................................................. Overall Dimensions and Connecting Data ...........................................
Notes 2 © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT AJ0976
Safety Information Explanation of Safety Messages Important Safety Instructions Precautionary statements (“DANGER,” “WARNING,” and “CAUTION”), followed by specific instructions, are found in this manual and on machine decals. These precautions are intended for the personal safety of the operator, user, servicer, and those maintaining the machine. Save These Instructions DANGER Indicates an imminently hazardous situation that, if not avoided, will cause severe personal injury or death.
Safety Information 11. Install the press according to the INSTALLATION INSTRUCTIONS. All connections for steam, electrical power and grounding must comply with local codes and be made by licensed personnel when required. 12. Replace worn power cords and/or loose plugs. 13. Never operate the press with any guards and/or panels removed. 14. DO NOT operate the press with missing or broken parts.
Operation Overall Dimensions and Connecting Data 2.75 in. (70 mm) BASE PAD (6 PLACES) 4 x 6 in. (102 x 152 mm) ELECTRICAL INLET HEIGHT: 67 in. (1702 mm) AIR INLET 1.375 in. (35 mm) 4 in. 34 in. (102 mm) (865 mm) BASE 18.25 in. (464 mm) BASE 36.75 in. (935 mm) 1.375 in. (35 mm) 28 in. (711 mm) PLAN VIEW MANUAL SPRAY ASSEMBLY STEAM IN AND STEAM RETURN LEFT END GUARD 11 in. (279 mm) 76 in. (1932 mm) AIR INLET 5.75 in. (144 mm) 43 in. (1091 mm) 20.63 in. (525 mm) 103.88 in. (2638 mm) BASE 125.
Operation Dimensions and Specifications STANDARD BUCK – 18 in. 18 in. (457 mm) STANDARD, TAPERBODY, PULLOVER AND STIFF BOSOM SHIRTS 36.875 in. (937 mm) SIZE 14-16 16 in. (406.4 mm) CAB687N DIMENSIONS OF BUCK BEFORE PADDING IS APPLIED NOTE: Actual pressing is 33.75 in. (318 mm) from top.
Operation Utility Specifications Electric Voltage/Hertz/Phase 200/60/3 230/60/3 460/60/3 575/60/3 220/50/3 380/50/3 415/50/3 30.7 29.5 14.8 16.8 N/A N/A N/A Circuit Breaker 50 50 25 30 N/A 25 25 Dual Element Fuse 60 60 30 35 N/A 30 30 24.5 23.6 11.8 13.4 N/A 11.8 11.
Operation Shipping Information U.S.A. Metric Length 111 in. 282 cm Width 42 in. 107 cm Height 82 in. 208 cm Weight 2470 lbs. 1120 kg NOTE: Applicable codes, ordinances, specifications and/or other governing data related to installation must be complied with. The materials listed in Table 1 may or may not conform to these requirements.
Operation Receiving Inspection The press is shipped assembled and enclosed in a plastic cover and crate. Upon delivery, inspect crate and contents for shipping damage. If crate or cover is damaged, or signs of possible damage are evident, have carrier note the condition on the shipping papers before shipping receipt is signed, or advise carrier of condition when discovered. Remove protective cover and check items received against items listed on packing list.
Operation Anchoring and Leveling Press Refer to Figure 3. B REMOVE ACCESS PANEL TO INSTALL CENTER LEVELING BOLT RIGHT LEVELING BOLTS CENTER LEVELING BOLTS C CENTER LEVELING BOLTS A CAB85N LEFT END LEVELING BOLTS CAB85N Figure 3 1. Place machine in desired location. 2. Trace the 6anchoring holes onto the floor. 3. Move the press aside. 4. Drill the floor in all 6 places with a masonry bit so that it will accept the 5/8"-11 expansion anchors. 5. Insert 5/8"-11 expansion anchors into holes. 6.
Operation 10. Place level along inside carriage rail at C and raise or lower either end of press as necessary. Turn leveling bolts equal amounts to maintain alignment at A and B. Connecting Steam Supply and Returns 11. Use a level to recheck A, B, and C. NOTE: Clean out all pipe lines before connecting them to the press. 12. Turn two center leveling bolts until they just touch the floor. 13. Tighten leveling bolt jam nuts and bolt press to floor. 14. Use a level to recheck A, B and C. 15.
Operation Connecting Air Service Air service connected to press must have a minimum constant pressure of 75 psi (5.17 bar) and be of ample volume to meet requirements listed in Utility Specifications section. Air pressure should be reduced to 65 psi (4.48 bar) at air inlet regulator.
Operation Routing Blower Exhaust from Press Final Check-Out Procedures Blower exhaust can add unwanted heat and noise into a room. Route blower exhaust from press upward near ceiling or to outside. Running exhaust outside is recommended. If running exhaust outside, make sure rain cannot get in. NOTE: Refer to Operation Manual to identify controls before performing the following checkouts.
Operation Electrical Check-Out 1/8 in. (3 mm) Black and red electrical control buttons start and stop all electrical functions. 1/8 in. (3 mm) 1/8 in. (3 mm) 1. Reset air to press per step 1 in Buck Indexing Mechanical Check-Out. Turn electrical on to press at fused disconnect switch or circuit breaker. 2. Make sure Emergency Stop button is up if applicable. 3. Press black start button. NOTE: Start button will not start blower unless air is reset to press. CAB240N Figure 6 8.
Operation Steam Injection and Temperature Check-Out WARNING The following checks ensure that the steam supply to the press is of sufficient temperature. WARNING To avoid possible serious injury or death, perform the following BEFORE proceeding to check out: • Shut off AND lock out ALL electrical power to press. • Shut off AND lock out ALL air service to press. W370 Turn electrical power off. 1. Slowly open shut-off valves in both steam supply and return lines. 2.
Operation Break-In Adjustments As new press is used, working surfaces “seat-in” and friction decreases. This usually results in increased working speed. These conditions are considered normal in a new press and do not indicate a need for constant maintenance. This initial “break-in” period will vary with usage, but generally occurs during the first week of operation. At this time the following items should be inspected and adjusted if necessary. 1. Recheck the level of press.