Measurement Guide

Use this form to record measurements:
1. **Threshold Slope Check:**
- Place the 9” level on the threshold in at least 3 places.
- Ensure the slope is towards the interior of the shower.
- Note: If the existing threshold is level or slopes away, consider our 3/4"
wide half-moon threshold for water containment.
2. **Threshold Width:**
- Measure the width of the threshold.
- Minimum requirement: 2½”.
3. **Height of Opening and Door Placement:**
- Measure the overall height of the opening.
- Mark with painters tape where you want the top of the door to be.
- Mark the spot with a pencil.
4. **Width Measurement:**
- Measure the width in at least 3 places (refer to diagram below).
- Calculate the difference between the longest and shortest measurements.
- If the difference is 1/4" or less, place your order using the shortest mea-
surement.
- If greater than 7/16", proceed to step 5 for an accurate measurement.
Measurement Sheet Solo


(4) Top of Door
(4) Mid Point
(3) Unit Height that you would like
can be up to 84" Maximum width is 32"
(2) Threshold Width Minimum 2 1/2"
(4) Botttom
Special Notes:
Acrylic Surround: Avoid attaching hinges directly to acrylic surrounds.Showerhead Placement:
Never position opposite the door. Exceptions for low-flow heads pointing down.
Door Swing Obstructions: Check for potential damage-causing obstructions at 90 degrees.
Options: resize door, switch sides, consider sliders.Ceiling Height: Ensure no low-hanging
fixtures when opening SOLO door.

Summary of content (2 pages)