aid in properly setting the tub.
7. Verify that the product is level by checking the tub deck surface in all directions.
8.
Options A: (Whirlpools with Air on/off Switches only) Plug the pump cord into the dedicated 120V/20A GFCI outlet
to supply electrical power to the system. The cord is attached to the pump & is shipped with the system.
Options B: (Air Massage with 3 button control only) Plug the blower cord into blower control box. The male end
from the blower control box plugs into the dedicated 120V/20A GFCI outlet to supply electrical power to the system.
The cord is attached to the blower & is shipped with the system.
Option C: (Total massages with 6 button control only) Plug the pump cord into the whirlpool control box (female
end with the letter P). The male end from the whirlpool control box plugs into the dedicated 120V/20A GFCI outlet
to supply electrical power to the system.
Plug the lighted blower cord into the blower control box (female end
with the letter B). The male end from the blower control box plugs into the dedicated 120V/20A GFCI outlet to
supply electrical power to the system. The cords and the plugs are shipped with the system.
For Option A & C: (OPTIONAL Factory Installed Heater) Plug the lighted heater cord into its own separate
dedicated 120V/20A GFCI outlet to supply electrical power for the heater. The heater and whirlpool pump must be
grounded with a size 8 wire. This wire does come with the heater.
For Option A, B & C: (OPTIONAL Factory Installed Mood light or Chromatherapy Light Kit) Plug the male end of
the black control box into 120V/15A GFCI outlet to supply electrical power for the light kit.
9.
Connect the waste overflow to the drain, per overflow & drain instructions provided by the drain manufacturer.
ATTENTION INSTALLER: This tub must be tested for leaks at the rough installation stage. Failure to do so
will void the warranty. This tub was tested at the factory and found to be fully operational and leak-free
prior to shipping. Shipping, handling, and job site exposure may have deteriorated the tub’s condition. It
is the responsibility of the installer to thoroughly test the tub prior to completing installation. Prior to
drilling tub for faucets, fill tub with water. Allow tub to stand for at least 5 minutes for a static test. Then
turn on the whirlpool for a water pressure test for at least 20 minutes. Check for leaks. If any leaks are
discovered, do not complete installation until the issue is resolved. Clarke Products will not be
responsible for leaks after the tub is installed, or any cost involved with removing or reinstalling the tub or
the cost of any surrounding materials or labor.
10.
Place the fill spout and supply lines at the desired location. If you are installing the spout and supply lines on the
deck of the tub, mark the location first and drill pilot holes from the acrylic side of the product. Use a properly sized
hole saw, and drill the spout and supply line holes from the acrylic side of product
11.
Connect the water supply lines
12.
After plumbing and electrical connections have been made the tub should be cleaned of dirt and debris. Follow
“Cleaning and Maintenance” instructions on next page.
This wrapping helps protect the
cords to the control boxes. They do
not ship connected to help protect
them, please refer to wiring
diagram on page 4.