Operator`s manual
Page -16- CLARKE TECHNOLOGY Operator's Manual -Vision 17B/BT
MAINTENANCE (cont'd)
Figure 23
Figure 24
Figure 25
Figure 26
Figure 27
Procedures to be Performed Before Work is
Begun
Keep the machine clean. It will need fewer repairs
and have a longer life.
1. Unplug charger from the wall.
2. Disconnect the connector on the battery
charger from the connector on the batteries.
See figure 23.
3. Join the connector from the batteries to the
connector on the tank support. See figure 24.
4. Make sure the recovery tank cover is in place.
5. Check the solution tank screen and clean if
necessary. See figure 25.
6. Make sure the vacuum screen is clean and in
position in the front of the recovery tank. See
figure 26.
7. Make sure the solution and recovery drain
hoses are in position on the back of the ma-
chine. See figure 27. Secure the hose drain
plugs.
8. Make sure the bumper skirt is in position. The
bumper skirt prevents solution from flowing from
under the frame.
9. Make sure the brush is in position.
10. Make sure the vacuum hose is installed and on
the squeegee. See figure 28 on page 17.
Procedures to be Performed at the End of
Work
1. Disconnect machine from power source.
2. Drain and flush the tanks. To drain the recovery
and solution tanks, follow this procedure:
a. Remove the drain hose from the fitting on
the back of the machine.
b. Put the end of the hose over a drain or
bucket.
c. Run clean water into the solution and
recovery tanks to flush the tanks.
d. Put the end of both hoses over a drain or
bucket.










