Technical data

17
4.6 Electrical Installation
The Vent-Axia Compact heat pump range is available in either single or three phase power supply ver-
sions.
Any electrical work required to install or maintain this appliance should be carried out by a suitably
qualified electrician in accordance with current IEE regulations
To access the wiring terminals :-
i. remove the heat pump front cover by unscrewing the 2 x 5mm hex socket screws on each side of
the heat pump.
ii. remove the electronics cover plate by unscrewing the two 3mm cross head screws on the front
2 x 3mm cross
head screws
Cables should enter the unit from below using the cable entry ports provided.
The following sections detail the wiring connections for various applications.
Fig 13 Electrics box with
the front removed
Wiring Terminals
Controller
Fig 12 Position of
Hex screws on the
Electronics cover
Plate
MCBs