Technical data

20
400Vac 50Hz Power
Supply
DHW time
clock
DHW
valve
Fault Reverse
cycle
Heat Pump Wiring Terminal block
Enable
Signal
4.6.2 Three Phase Power Supplies
4.6.3 DHW time clock and 3 way diverting valve wiring
Note: The hot water cylinder high limit stat maybe required to be wired into the live return from the DHW
Heating Time Clock.
Note: If DHW option is enabled after commissioning and connection to DHW time clock, remove DHW
enable link.
Fig 17 Heat pump
Wiring—Three Phase
Power Supplies
Fig 18 Heat Pump Wiring—DHW
230 Vac 50Hz power supply
via a Type D MCB in the
buildings distribution Board
To/From Heating
Control System i.e.
Underfloor Control
Unit
Heat Pump Wiring Terminal block
Fault
Reverse
cycle
Optional High Limit
DHW Stat
Enable Signal links removed