Section: R500.E153C Bulletin: E153-C Date: 5-10-09 Supersedes: E153-A-1 World’s Leader in Boiler Trim Instrumentation & Controls Prismatic and Flat Glass Water Gage Maintenance Instructions Flat Glass Gage Glass Prismatic Gage Glass 16633 Foltz Parkway, Strongsville, OH 44149 USA Telephone: (440) 572-1500 Fax: (440) 238-8828 www.clark-reliance.
Unpacking and inspection Upon receipt of the Boiler Drum Level instruments, examine the contents of the container(s) for damage. Report any faulty conditions as soon as possible to your carrier to avoid acceptance of damaged goods. Clark-Reliance will not be responsible for goods damaged in shipping or storage, or subsequent loss or damage due to improper storage or exposure as a result of damage to shipping containers.
Boil-out Gage Practice and Policy On new boiler installations, it is common procedure to initially operate the boiler at a reduced pressure for a short time to ‘cook out’ foreign materials (pipe joint compound, grease, oil, flux, etc.) that remain in the drum or other pressurized parts of the system after the boiler has been constructed. During this boil-out period, most of the suspended or dissolved debris is flushed out with blow-down discharges.
Recommended Blow-Down Procedure for Water Columns and Gage Glasses The importance of proper cleaning and maintenance of the water column and the water gage glass, or sight glass, cannot be stressed enough. The water column must he kept clean to ensure the water level in the gage glass accurately represents the water level in the boiler. Note that the frequency and method of blow-down may affect service life and performance of the water column and gage glass.
3. Always notify control room personnel prior to conducting a Blo w-Down to prevent any false alarms or false trips. Recommended Maintenance and Annual Inspections Regarding any recommended maintenance procedures or annual inspections, we suggest any device containing probes should be inspected on an annual basis for contaminated probes and wire secure terminations. Caution: Before proceeding, follow any and all plant lock out - tag out procedures required.
Prismatic and Flat Glass Gages BEFORE YOU INSTALL THE GAGE GLASS: - Support brackets should be considered for gages over four feet long and weighing in excess of 100 pounds. The support brackets will help prevent overloading of the connecting valves and piping. The brackets will also help prevent damage caused by excessive vibration.
Disassembly: -After pressure is relieved from the gage glass, remove from the boiler drum and lay flat on a workbench -Loosen end bolting first, working from the opposite ends toward the center of the gage. -Remove all components including washers, finger clamps, cover plates, gaskets, glass, and Mica shields. Retain the bolting and cover plates. Discard all gaskets, glass, and Mica.
Recommendations and Instructions for Hot Torquing Gage Glasses and Probe Type Devices When a new piece of equipment, whether a Gage Glass or a Probe* type device is installed, the hot torque procedure must be performed. This ensures that all bolting and components are properly seated for optimum performance. This procedure must also be performed after any maintenance is done to the equipment.
Installation Instructions for Model GL-53 Water Gage Illuminators for Tubular Glass Gages or Prismatic Gages 1. General Information Model GL-53 Water Gage Illuminators are designed to improve the vision of the water level, for plant personnel. If a tubular glass or prismatic type water gage is installed in an area with adequate lighting, a gage illuminator may not be required.
Wiring instructions for the Clark • Reliance GL53 Illuminators (for 'C' and 'S' Series Gages). Note: Make sure that the power is turned off to the supply wiring before connecting the illuminator. Tools needed: – Slotted Screwdriver – 1/2" Wrench 1. Open the illuminator housing by loosening the three hex head cap screws on the end of the unit that secures the Conduit/Lamp assembly in place. 2. Carefully remove the assembly and remove the 60W Frosted Lamp (B) from the illuminator housing and set aside. 3.
Wiring instructions for the Standard and Vertical Clark • Reliance Flat Glass Gage Illuminators Note: Make sure that the power is turned off to the supply wiring before connecting the illuminator. Tools needed: – Slotted Screwdriver 1. Open the illuminator housing by loosening the thumb screw (A) in the side of the unit that secures the door assembly in place. 2. Carefully open the door and remove the 150W clear lamp (B) from the inside of the illuminator housing and set aside. 3.
Confirm that the correct supply voltage is being applied to the illuminator power supply. The unit has been manufactured for a specific power source, either 120 or 240 VAC.
RECOMMENDED SPARE PARTS PRISMATIC GAGE GLASS Size/Type Part No. Description Quantity C4 or S4 RK-35 Repair Kit (incl. Glass & Gaskets) 1 per section C5 or S5 RK-35A Repair Kit (incl. Glass & Gaskets) 1 per section C6 or S6 RK-35B Repair Kit (incl. Glass & Gaskets) 1 per section C7 or S7 RK-35C Repair Kit (incl. Glass & Gaskets) 1 per section C8 or S8 RK-35D Repair Kit (incl. Glass & Gaskets) 1 per section C9 or S9 RK-35E Repair Kit (incl.
*** REPLACEMENT PARTS WARNING *** The use of non-Original Equipment Manufacturer parts (such as glass, gaskets, probes, modules, etc.) will void the Agency Approval (FM, UL, CSA, CRN, ABS, etc.), pressure/temperature rating, and warranty of this equipment. Clark-Reliance requires the use of OEM parts for all repairs on this product in order to maintain plant and personnel safety, and reliable operation.
"PARTS-PLUS" Critical spare parts for overnight delivery, direct from the manufacturer. clark-reliance.com/parts Steel Valve Repair Kit Replacement Probes Gage Glass Repair Kit Simpliport Module Simpliport Packing Nut Replacement Relays Probe Repair Kit Replacement EA100 Ass’y Bronze Valve Repair Kit Valve Packing Replacement Floats Replacement Micro-switch 16633 Foltz Parkway Strongsville, OH 44149 USA Phone (440) 572-1500 Fax (440) 238-8828 sales@clark-reliance.com www.clark-reliance.