Instruction manual

236 JUPITER CM-4400 Control Module - Installation and Operating Manual
Section 7 — Jupiter Control Center
4. Click on the Activate button. The JNS message status dialog will then
appear. This dialog will inform you that the set is being updated.
Figure 192. The Set Activation Status Dialog
The activated set will then appear in the Current Set field at the bottom left
of the dialog (see Figure193).
Figure 193. The Set Activation Selection Completes Dialog
At this point, a reboot command will be sent to all the boards in the set, and
the boards will reboot and download the new set.
CAUTION Once the activate/reboot command has been issued, do not interrupt the
process until the reboot is complete. Interruptions such as sending a new
command, turning off power, or disconnecting cables will have unpredictable
consequences. With a CM-4400, such consequences can include corruption
of data stored in memory.
Performing a Pending Reboot Procedure
Follow these steps to perform a Pending Reboot procedure:
1. Start the Control Center application (JNS application> Control Center).
The Control Center dialog will then appear (Figure194).
The activated set
in the Current Set
field