Warranty

In staller/O w n er R espon sibility:
Ic o n ic F lo o rs, L L C striv e s to o e r its c u sto m e rs th e h ig h e st q u a lity e n g in e e re d h a rd w o o d o o rin g . C a re fu lly re v ie w
th is installation guide to ensure satisfactory results w ith your installation.
E x a m in e th e o o rin g u p o n re c e ip t a n d p rio r to in sta lla tio n . E x a m in e fo r g ra d e , c o lo r, n ish , q u a lity, a n d tra n sit
dam age. L ighting m ust be adequate for proper inspection. If ooring is deem ed unacceptable, contact S eller
im m e d ia te ly a n d a rra n g e fo r re p la c e m e n t. Ic o n ic F lo o rs, L L C c a n n o t a c c e p t re sp o n sib ility fo r in sta lla tio n o f
o o rin g w ith v isib le d e fe c ts.
P rio r to in sta lla tio n , th e in sta lle r m u st in su re th e jo b site a n d /o r su b o o r m e e t I c o n ic F lo o r's in sta lla tio n
in stru c tio n s re q u ire m e n ts. I c o n ic F lo o rs is n o t re sp o n sib le fo r o o rin g fa ilu re re su ltin g fro m u n a c c e p ta b le
jo b site a n d /o r o o rin g c o n d itio n s.
W h e n p u rc h a sin g Ic o n ic F lo o rs, L L C e n g in e e re d h a rd w o o d o o rin g , a d d 5 % to th e a c tu a l re q u ire d sq u a re
footage as a cutting allow ance.
Jobsite an d P re-In stallation R equ irem en ts:
H a rd w o o d o o rin g sh o u ld b e o n e o f th e la st ite m s in sta lle d fo r a n y c o n stru c tio n o r re n o v a tio n p ro je c t. W o rk
involving w ater or m oisture m u st be com pleted before ooring installation. R oom tem perature and hum idity in the
installation area should be consistent w ith norm al, year-round living conditions, and should achieve this for a t lea st
on e w eek prior to in stallation. R ecom m ended ranges are 60-70 (fahrenheit) degrees for tem perature, and 40-60%
fo r h u m id ity. I c o n ic F lo o rs m ay b e in sta lle d in w e ll- v e n tila te d b a th ro o m e n v iro n m e n ts, b u t th e o o r m u st b e d rie d
o f a n y sta n d in g w a te r a s it o c c u rs.
S to re Ic o n ic o o rin g in in sta lla tio n a re a fo r 2 4 - 7 2 h o u rs p rio r to in sta llin g . is w ill a llo w a c c lim a tiz a tio n o f th e
w o o d . D o n o t sto re d ire c tly o n c o n c re te o r n e a r o u tsid e w a lls.
In sta lla tio n T o o ls:
e fo llo w in g h a n d to o ls a r e r e co m m en d ed
C arpenter's P en cil H am m er (16 20 oz) S p a c e r s ( w o o d / p la s tic ). O r c u t e n d s / p ie c e s o f
o o r in g . S e t o n e d g e .
C h a lk lin e H an d saw (C ro sscu t) T ape M easure
C r o w b a r / 'W o n d e r ' B a r N a il S e t T a p p in g B lo c k ( t r im m e d p ie c e o f o o r in g )
e fo llo w in g p o w er too ls w ill sp eed in sta lla tio n
Bench Saw/T a b le S a w or M it e r S a w or C irc u la r S a w
e fo llo w in g a p p ly to in d iv id u a l in sta lla tio n m e th o d s
N a il- d o w n : 1 / 2 P o w e r N a ile r 1 - 1 / 4 C le a t s or P in , B r a d o r F in is h N a ile r
G lu e - d o w n : F lo o rin g a d h e siv e T ro w el (16 ga., 18 ga., 1-1/4” or 1-1/2” brads/nails)
F lo a tin g : 6 - m il p o ly lm D u ct tap e/P o ly tap e F oam U nderlaym ent P V A C g lu e
A ccep ta b le S u b oors:
G en erally, su b oors m u st be–
Structurally Sound;
L e v e l . F lat to 3/16" per 10' radius;
C l e a n . oroughly sw ept and free of all debris. Free of w ax, grease, pain t, sealers, old adh esives and other substances; and
D r y a n d r e m a in d r y . Suboor m ust rem ain dry year-round. M o istu re c o n te n t m u st n o t e x c e e d 1 3 % fo r m o s t su rfa c e s, a n d
2 .5 % fo r c o n c re te . T e stin g fo r m o istu re m a y b e d o n e w ith a c o m m e rc ia lly a v a ila b le m oisture m eter. A n alternative m ethod
is listed under 'C oncrete Suboors'.
Prem ium H ardwood Flooring Installation Instructions
In staller/O w n er R espon sibility:
Ic o n ic F lo o rs, L L C striv e s to o e r its c u sto m e rs th e h ig h e st q u a lity e n g in e e re d h a rd w o o d o o rin g . C a re fu lly re v ie w
th is installation guide to ensure satisfactory results w ith your installation.
E x a m in e th e o o rin g u p o n re c e ip t a n d p rio r to in sta lla tio n . E x a m in e fo r g ra d e , c o lo r, n ish , q u a lity, a n d tra n sit
dam age. L ighting m ust be adequate for proper inspection. If ooring is deem ed unacceptable, contact S eller
im m e d ia te ly a n d a rra n g e fo r re p la c e m e n t. Ic o n ic F lo o rs, L L C c a n n o t a c c e p t re sp o n sib ility fo r in sta lla tio n o f
o o rin g w ith v isib le d e fe c ts.
P rio r to in sta lla tio n , th e in sta lle r m u st in su re th e jo b site a n d /o r su b o o r m e e t I c o n ic F lo o r's in sta lla tio n
in stru c tio n s re q u ire m e n ts. I c o n ic F lo o rs is n o t re sp o n sib le fo r o o rin g fa ilu re re su ltin g fro m u n a c c e p ta b le
jo b site a n d /o r o o rin g c o n d itio n s.
W h e n p u rc h a sin g Ic o n ic F lo o rs, L L C e n g in e e re d h a rd w o o d o o rin g , a d d 5 % to th e a c tu a l re q u ire d sq u a re
footage as a cutting allow ance.
Jobsite an d P re-In stallation R equ irem en ts:
H a rd w o o d o o rin g sh o u ld b e o n e o f th e la st ite m s in sta lle d fo r a n y c o n stru c tio n o r re n o v a tio n p ro je c t. W o rk
involving w ater or m oisture m u st be com pleted before ooring installation. R oom tem perature and hum idity in the
installation area should be consistent w ith norm al, year-round living conditions, and should achieve this for a t lea st
on e w eek prior to in stallation. R ecom m ended ranges are 60-70 (fahrenheit) degrees for tem perature, and 40-60%
fo r h u m id ity. I c o n ic F lo o rs m ay b e in sta lle d in w e ll- v e n tila te d b a th ro o m e n v iro n m e n ts, b u t th e o o r m u st b e d rie d
o f a n y sta n d in g w a te r a s it o c c u rs.
S to re Ic o n ic o o rin g in in sta lla tio n a re a fo r 2 4 - 7 2 h o u rs p rio r to in sta llin g . is w ill a llo w a c c lim a tiz a tio n o f th e
w o o d . D o n o t sto re d ire c tly o n c o n c re te o r n e a r o u tsid e w a lls.
In sta lla tio n T o o ls:
e fo llo w in g h a n d to o ls a r e r e co m m en d ed
C arpenter's P en cil H am m er (16 20 oz) S p a c e r s ( w o o d / p la s t ic ). O r c u t e n d s / p ie c e s o f
o o r in g . S e t o n e d g e .
C h a lk lin e H an d saw (C ro sscu t) T ape M easure
C r o w b a r / 'W o n d e r ' B a r N a il S e t T a p p in g B lo c k ( t r im m e d p ie c e o f o o r in g )
e fo llo w in g p o w er too ls w ill sp eed in sta lla tio n
Bench Saw/T a b le S a w or M it e r S a w or C ir c u la r S a w
e fo llo w in g a p p ly to in d iv id u a l in sta lla tio n m e th o d s
N a il- d o w n : 1 / 2 P o w e r N a ile r 1 - 1 / 4 C le a t s or P in , B r a d o r F in is h N a ile r
G lu e - d o w n : F lo o rin g a d h e siv e T ro w el (16 ga., 18 ga., 1-1/4” or 1-1/2” brads/nails)
F lo a tin g : 6 - m il p o ly lm D u ct tap e/P o ly tap e F oam U n derlaym ent P V A C g lu e
A ccep ta b le S u b oors:
G en erally, su b oors m u st be–
Structurally Sound;
L e v e l . F lat to 3/16" per 10' radius;
C l e a n . oroughly sw ept and free of all debris. Free of w ax, grease, pain t, sealers, old adh esives and other substances; and
D r y a n d r e m a in d r y . Suboor m ust rem ain dry year-round. M o istu re c o n te n t m u st n o t e x c e e d 1 3 % fo r m o st s u r fa c e s, a n d
2 .5 % fo r c o n c re te . T e stin g fo r m o istu re m a y b e d o n e w ith a c o m m e rc ia lly a v a ila b le m oisture m eter. A n alternative m ethod
is listed under 'C oncrete Suboors'.
Prem ium H ardwood Flooring Installation Instructions
In staller/O w n er R espon sibility:
Ic o n ic F lo o rs, L L C striv e s to o e r its c u sto m e rs th e h ig h e st q u a lity e n g in e e re d h a rd w o o d o o rin g . C a re fu lly re v ie w
th is installation guide to ensure satisfactory results w ith your installation.
E x a m in e th e o o rin g u p o n re c e ip t a n d p rio r to in sta lla tio n . E x a m in e fo r g ra d e , c o lo r, n ish , q u a lity, a n d tra n sit
dam age. L ighting m ust be adequate for proper inspection. If ooring is deem ed unacceptable, contact S eller
im m e d ia te ly a n d a rra n g e fo r re p la c e m e n t. Ic o n ic F lo o rs, L L C c a n n o t a c c e p t re sp o n sib ility fo r in sta lla tio n o f
o o rin g w ith v isib le d e fe c ts.
P rio r to in sta lla tio n , th e in sta lle r m u st in su re th e jo b site a n d /o r su b o o r m e e t I c o n ic F lo o r's in sta lla tio n
in stru c tio n s re q u ire m e n ts. I c o n ic F lo o rs is n o t re sp o n sib le fo r o o rin g fa ilu re re su ltin g fro m u n a c c e p ta b le
jo b site a n d /o r o o rin g c o n d itio n s.
W h e n p u rc h a sin g Ic o n ic F lo o rs, L L C e n g in e e re d h a rd w o o d o o rin g , a d d 5 % to th e a c tu a l re q u ire d sq u a re
footage as a cutting allow ance.
Jobsite an d P re-In stallation R equ irem en ts:
H a rd w o o d o o rin g sh o u ld b e o n e o f th e la st ite m s in sta lle d fo r a n y c o n stru c tio n o r re n o v a tio n p ro je c t. W o rk
involving w ater or m oisture m u st be com pleted before ooring installation. R oom tem perature and hum idity in the
installation area should be consistent w ith norm al, year-round living conditions, and should achieve this for a t lea st
on e w eek prior to in stallation. R ecom m ended ranges are 60-70 (fahrenheit) degrees for tem perature, and 40-60%
fo r h u m id ity. I c o n ic F lo o rs m ay b e in sta lle d in w e ll- v e n tila te d b a th ro o m e n v iro n m e n ts, b u t th e o o r m u st b e d rie d
o f a n y sta n d in g w a te r a s it o c c u rs.
S to re Ic o n ic o o rin g in in sta lla tio n a re a fo r 2 4 - 7 2 h o u rs p rio r to in sta llin g . is w ill a llo w a c c lim a tiz a tio n o f th e
w o o d . D o n o t sto re d ire c tly o n c o n c re te o r n e a r o u tsid e w a lls.
In sta lla tio n T o o ls:
e fo llo w in g h a n d to o ls a r e r e co m m en d ed
C arpenter's P en cil H am m er (16 20 oz) S p a c e r s ( w o o d / p la s t ic ). O r c u t e n d s / p ie c e s o f
o o r in g . S e t o n e d g e .
C h a lk lin e H an d saw (C ro sscu t) T ape M easure
C r o w b a r / 'W o n d e r ' B a r N a il S e t T a p p in g B lo c k ( t r im m e d p ie c e o f o o r in g )
e fo llo w in g p o w er too ls w ill sp eed in sta lla tio n
Bench Saw/T a b le S a w or M it e r S a w or C ir c u la r S a w
e fo llo w in g a p p ly to in d iv id u a l in sta lla tio n m e th o d s
N a il- d o w n : 1 / 2 P o w e r N a ile r 1 - 1 / 4 C le a t s or P in , B r a d o r F in is h N a ile r
G lu e - d o w n : F lo o rin g a d h e siv e T ro w el (16 ga., 18 ga., 1-1/4” or 1-1/2” brads/nails)
F lo a tin g : 6 - m il p o ly lm D u ct tap e/P o ly tap e F oam U n derlaym ent P V A C g lu e
A ccep ta b le S u b oors:
G en erally, su b oors m u st be–
Structurally Sound;
L e v e l . F lat to 3/16" per 10' radius;
C l e a n . oroughly sw ept and free of all debris. Free of w ax, grease, pain t, sealers, old adh esives and other substances; and
D r y a n d r e m a in d r y . Suboor m ust rem ain dry year-round. M o istu re c o n te n t m u st n o t e x c e e d 1 3 % fo r m o st s u r fa c e s, a n d
2 .5 % fo r c o n c re te . T e stin g fo r m o istu re m a y b e d o n e w ith a c o m m e rc ia lly a v a ila b le m oisture m eter. A n alternative m ethod
is listed under 'C oncrete Suboors'.
Prem ium H ardwood Flooring Installation Instructions
PGWood strives to oer its customers the highest quality engineered hardwood ooring. Carefully review this
installation guide to ensure satisfactory results with your installation.
Examine the ooring upon receipt and prior to installation. Examine for grade, color, nish, quality, and transit
damage. Lighting must be adequate for proper inspection. If ooring is deemed unacceptable, contact Seller
immediately and arrange for replacement. PGWood cannot accept responsibility for installation of ooring
with visible defects.
• Prior to installation, the installer must insure the jobsite and/or suboor meet PGWood's installation
instructions/requirements. PGWood is not responsible for ooring failure resulting from unacceptable
jobsite and/or ooring conditions.
When purchasing PGWood engineered hardwood ooring, add 5% to the actual required square footage as
a cutting allowance.
Hardwood ooring should be one of the last items installed for any construction or renovation project. Work
involving water or moisture must be completed before ooring installation. Room temperature and humidity in the
installation area should be consistent with normal, year-round living conditions for at least one week prior to
installation. Recommended ranges are 60-70 (fahrenheit) degrees, and 40-60% humidity. Flooring may be installed
in well-ventilated bathroom environments, but the oor must be dried of any standing water as it occurs.
Store ooring in installation area for 24-72 hours prior to installing. is will allow acclimatization of the wood.
In staller/O w n er R espon sibility:
Ic o n ic F lo o rs, L L C striv e s to o e r its c u sto m e rs th e h ig h e st q u a lity e n g in e e re d h a rd w o o d o o rin g . C a re fu lly re v ie w
th is installation guide to ensure satisfactory results w ith your installation.
E x a m in e th e o o rin g u p o n re c e ip t a n d p rio r to in sta lla tio n . E x a m in e fo r g ra d e , c o lo r, n ish , q u a lity, a n d tra n sit
dam age. L ighting m ust be adequate for proper inspection. If ooring is deem ed unacceptable, contact S eller
im m e d ia te ly a n d a rra n g e fo r re p la c e m e n t. Ic o n ic F lo o rs, L L C c a n n o t a c c e p t re sp o n sib ility fo r in sta lla tio n o f
o o rin g w ith v isib le d e fe c ts.
P rio r to in sta lla tio n , th e in sta lle r m u st in su re th e jo b site a n d /o r su b o o r m e e t I c o n ic F lo o r's in sta lla tio n
in stru c tio n s re q u ire m e n ts. I c o n ic F lo o rs is n o t re sp o n sib le fo r o o rin g fa ilu re re su ltin g fro m u n a c c e p ta b le
jo b site a n d /o r o o rin g c o n d itio n s.
W h e n p u rc h a sin g Ic o n ic F lo o rs, L L C e n g in e e re d h a rd w o o d o o rin g , a d d 5 % to th e a c tu a l re q u ire d sq u a re
footage as a cutting allow ance.
Jobsite an d P re-In stallation R equ irem en ts:
H a rd w o o d o o rin g sh o u ld b e o n e o f th e la st ite m s in sta lle d fo r a n y c o n stru c tio n o r re n o v a tio n p ro je c t. W o rk
involving w ater or m oisture m u st be com pleted before ooring installation. R oom tem perature and hum idity in the
installation area should be consistent w ith norm al, year-round living conditions, and should achieve this for a t lea st
on e w eek prior to in stallation. R ecom m ended ranges are 60-70 (fahrenheit) degrees for tem perature, and 40-60%
fo r h u m id ity. I c o n ic F lo o rs m ay b e in sta lle d in w e ll- v e n tila te d b a th ro o m e n v iro n m e n ts, b u t th e o o r m u st b e d rie d
o f a n y sta n d in g w a te r a s it o c c u rs.
S to re Ic o n ic o o rin g in in sta lla tio n a re a fo r 2 4 - 7 2 h o u rs p rio r to in sta llin g . is w ill a llo w a c c lim a tiz a tio n o f th e
w o o d . D o n o t sto re d ire c tly o n c o n c re te o r n e a r o u tsid e w a lls.
In sta lla tio n T o o ls:
e fo llo w in g h a n d to o ls a r e r e co m m en d ed
C arpenter's P en cil H am m er (16 20 oz) S p a c e r s ( w o o d / p la s t ic ). O r c u t e n d s / p ie c e s o f
o o r in g . S e t o n e d g e .
C h a lk lin e H an d saw (C ro sscu t) T ape M easure
C r o w b a r / 'W o n d e r ' B a r N a il S e t T a p p in g B lo c k ( t r im m e d p ie c e o f o o r in g )
e fo llo w in g p o w er too ls w ill sp eed in sta lla tio n
Bench Saw/T a b le S a w or M it e r S a w or C ir c u la r S a w
e fo llo w in g a p p ly to in d iv id u a l in sta lla tio n m e th o d s
N a il- d o w n : 1 / 2 P o w e r N a ile r 1 - 1 / 4 C le a t s or P in , B r a d o r F in is h N a ile r
G lu e - d o w n : F lo o rin g a d h e siv e T ro w el (16 ga., 18 ga., 1-1/4” or 1-1/2” brads/nails)
F lo a tin g : 6 - m il p o ly lm D u ct tap e/P o ly tap e F oam U n derlaym ent P V A C g lu e
A ccep ta b le S u b oors:
G en erally, su b oors m u st be–
Structurally Sound;
L e v e l . F lat to 3/16" per 10' radius;
C l e a n . oroughly sw ept and free of all debris. Free of w ax, grease, pain t, sealers, old adh esives and other substances; and
D r y a n d r e m a in d r y . Suboor m ust rem ain dry year-round. M o istu re c o n te n t m u st n o t e x c e e d 1 3 % fo r m o st s u r fa c e s, a n d
2 .5 % fo r c o n c re te . T e stin g fo r m o istu re m a y b e d o n e w ith a c o m m e rc ia lly a v a ila b le m oisture m eter. A n alternative m ethod
is listed under 'C oncrete Suboors'.
Prem ium H ardwood Flooring Installation Instructions
In staller/O w n er R espon sibility:
Ic o n ic F lo o rs, L L C striv e s to o e r its c u sto m e rs th e h ig h e st q u a lity e n g in e e re d h a rd w o o d o o rin g . C a re fu lly re v ie w
th is installation guide to ensure satisfactory results w ith your installation.
E x a m in e th e o o rin g u p o n re c e ip t a n d p rio r to in sta lla tio n . E x a m in e fo r g ra d e , c o lo r, n ish , q u a lity, a n d tra n sit
dam age. L ighting m ust be adequate for proper inspection. If ooring is deem ed unacceptable, contact S eller
im m e d ia te ly a n d a rra n g e fo r re p la c e m e n t. Ic o n ic F lo o rs, L L C c a n n o t a c c e p t re sp o n sib ility fo r in sta lla tio n o f
o o rin g w ith v isib le d e fe c ts.
P rio r to in sta lla tio n , th e in sta lle r m u st in su re th e jo b site a n d /o r su b o o r m e e t I c o n ic F lo o r's in sta lla tio n
in stru c tio n s re q u ire m e n ts. I c o n ic F lo o rs is n o t re sp o n sib le fo r o o rin g fa ilu re re su ltin g fro m u n a c c e p ta b le
jo b site a n d /o r o o rin g c o n d itio n s.
W h e n p u rc h a sin g Ic o n ic F lo o rs, L L C e n g in e e re d h a rd w o o d o o rin g , a d d 5 % to th e a c tu a l re q u ire d sq u a re
footage as a cutting allow ance.
Jobsite an d P re-In stallation R equ irem en ts:
H a rd w o o d o o rin g sh o u ld b e o n e o f th e la st ite m s in sta lle d fo r a n y c o n stru c tio n o r re n o v a tio n p ro je c t. W o rk
involving w ater or m oisture m u st be com pleted before ooring installation. R oom tem perature and hum idity in the
installation area should be consistent w ith norm al, year-round living conditions, and should achieve this for a t lea st
on e w eek prior to in stallation. R ecom m ended ranges are 60-70 (fahrenheit) degrees for tem perature, and 40-60%
fo r h u m id ity. I c o n ic F lo o rs m ay b e in sta lle d in w e ll- v e n tila te d b a th ro o m e n v iro n m e n ts, b u t th e o o r m u st b e d rie d
o f a n y sta n d in g w a te r a s it o c c u rs.
S to re Ic o n ic o o rin g in in sta lla tio n a re a fo r 2 4 - 7 2 h o u rs p rio r to in sta llin g . is w ill a llo w a c c lim a tiz a tio n o f th e
w o o d . D o n o t sto re d ire c tly o n c o n c re te o r n e a r o u tsid e w a lls.
In sta lla tio n T o o ls:
e fo llo w in g h a n d to o ls a r e r e co m m en d ed
C arpenter's P en cil H am m er (16 20 oz) S p a c e r s ( w o o d / p la s t ic ). O r c u t e n d s / p ie c e s o f
o o r in g . S e t o n e d g e .
C h a lk lin e H an d saw (C ro sscu t) T ape M easure
C r o w b a r / 'W o n d e r ' B a r N a il S e t T a p p in g B lo c k ( t r im m e d p ie c e o f o o r in g )
e fo llo w in g p o w er too ls w ill sp eed in sta lla tio n
Bench Saw/T a b le S a w or M it e r S a w or C ir c u la r S a w
e fo llo w in g a p p ly to in d iv id u a l in sta lla tio n m e th o d s
N a il- d o w n : 1 / 2 P o w e r N a ile r 1 - 1 / 4 C le a t s or P in , B r a d o r F in is h N a ile r
G lu e - d o w n : F lo o rin g a d h e siv e T ro w el (16 ga., 18 ga., 1-1/4” or 1-1/2” brads/nails)
F lo a tin g : 6 - m il p o ly lm D u ct tap e/P o ly tap e F oam U n derlaym ent P V A C g lu e
A ccep ta b le S u b oors:
G en erally, su b oors m u st be–
Structurally Sound;
L e v e l . F lat to 3/16" per 10' radius;
C l e a n . oroughly sw ept and free of all debris. Free of w ax, grease, pain t, sealers, old adh esives and other substances; and
D r y a n d r e m a in d r y . Suboor m ust rem ain dry year-round. M o istu re c o n te n t m u st n o t e x c e e d 1 3 % fo r m o st s u r fa c e s, a n d
2 .5 % fo r c o n c re te . T e stin g fo r m o istu re m a y b e d o n e w ith a c o m m e rc ia lly a v a ila b le m oisture m eter. A n alternative m ethod
is listed under 'C oncrete Suboors'.
Prem ium H ardwood Flooring Installation Instructions
e following hand tools are recommended—
Carpenters Pencil Hammer (16 – 20 oz) Spacers Or cut ends/pieces of ooring
(set on edge).
Chalkline Handsaw (Crosscut) Tape Measure
Crowbar/’Wonder’ Bar Nail Set Tapping Block (trimmed piece of ooring)
e following power tools will speed installation—
Bench Saw/Table Saw or Miter Saw or Chop Saw
e following apply to individual installation methods—
Nail-down: Pin, Brad or Finish Nailer (16 ga., 18 ga., 1-1/4” or 1-1/2” brads/nails)
Glue-down: Flooring adhesive Trowel
Floating: 6-mil poly lm Duct tape/Poly tape Underlayment PVAC glue
Generally,suboors must be—
Structurally Sound;
Level. Flat to 3/16” per 10’ radius;
Clean. oroughly swept & free of all debris. Free of wax, grease, paint, sealers, old adhesives & other substances; and
Dry and remain dry. Suboor must remain dry year round. Moisture content must not exceed 13% for most surfaces,
or 2.5% for concrete. Testing for moisture content may be done with a commercially available moisture meter. An
alternative method is listed under ‘Concrete Suboors’.

Summary of content (5 pages)