Warranty
• Lay subsequent rows by using ooring or nish nailer to blind nail top inside edge of tongue at 45° angle. Nail
each board every 8-12” and within 2” of each end. Remember to stagger the end joints from row to row, and use
a tapping block as needed to t boards together.
• It may be necessary to face-nail in doorways or tight areas where the nailer won’t t;
• e last row will need to be face-nailed as with the rst two rows.
G ettin g sta rted , con tin u ed
Y o u m a y w a n t to “d ry la y ” a fe w ro w s (n o g lu e o r n a ils) b e fo re sta rtin g in sta lla tio n to c o n rm y o u r la y o u t
d e c isio n s a n d w o rk in g lin e .
N ote: If o u tsid e w a ll is o u t o f sq u a re , a d ju st w o rk in g lin e to m a k e it stra ig h t fo r th e re st o f th e in sta lla tio n . Y o u
w ill n e e d to sc rib e th e rst ro w o f p la n k s to m a tc h th e w a ll a n d m a k e p o ssib le a stra ig h t w o rk in g lin e .
I n sta ll M e t h o d 1 – F lo a tin g
U nderlaym ent:
W e re c o m m e n d M P G lo b a l 'Q u ie tW a lk ' u n d e rla y m e n t. It re p la c e s th e n e e d fo r 6 - m il p o ly lm w h e n in sta llin g in
b e lo w - g ra d e c o n d itio n s. 'Q u ie tW a lk ' (a n d o th e r b ra n d s) h a s a 2 ' (5 c m ) to n g u e ru n n in g a lo n g its le n g th . is
should overlap the second course of underlaym ent and be fastened w ith eith er duct tape or poly tape.
ere is n o need to face-nail the perim eter. e advantage of a oating installation is that it allow s the building to
se e k its o w n c o n d itio n in g /e x p a n sio n /c o n tra c tio n rh y th m . A llo w 3 /1 6 ”p e rim e te r sp a c in g to a llo w th e o o r to re a c t
to se a so n a l e n v iro n m e n ta l c h a n g e . O u r h a rd w o o d p la n k is c o n d itio n e d to 6 - 8 % m o istu re c o n te n t, a n d a s su c h , is
lik e ly th e m o st sta b le c o m p o n e n t in th e b u ild in g a sse m b ly.
●
S ta rt th e rst ro w w ith th e g ro o v e sid e to n g u e - o u t; th a t is, fa c in g th e w a ll;
●
G lu e e n d jo in t o f rst ro w b y a p p ly in g a d h e siv e to th e bottom o f th e g ro o v e ;
●
A lw ays leave 1/4” expansion betw een ooring and all w alls and vertical objects
(pipes, cabinetry). U se w ood or plastic spacers to m aintain this expansion space;
●
L a y su b se q u e n t ro w s o f o o rin g b y a p p ly in g g lu e to sid e a n d e n d jo in ts, a n d
ttin g p la n k s w ith ta p p in g b lo c k . R e m e m b e r to sta g g e r e n d jo in ts fro m ro w
●
t o r o w .
I n sta ll M e t h o d 2 – N a il D o w n
I n s ta llin g r s t a n d s e c o n d r o w s —
●
L a y o o rin g p e rp e n d ic u la r to o o r jo ists, u n le ss su b o o r is e x istin g h a rd w o o d a n d /o r h a s b e e n stre n g th e n e d to
prevent sagging;
●
L a y rst p la n k in sid e c h a lk lin e w ith g ro o v e d e d g e to w a rd w a ll (to n g u e o u t). P re - d rill 1 - 1 /2 ” fro m g ro o v e d e d g e
a n d a b o u t 8 ” a p a rt. S e c u re p la n k s w ith n ish n a ils;
●
U se n a il p u n c h to c o u n te rsin k n a ils, a n d ll w ith w o o d lle r. R e p e a t o n to n g u e e d g e o f p la n k ;
●
Install entire rst and second row in this m anner. A lw ays leave 1/4” expansion s pace betw een ooring and all
w alls and vertical objects (pipes, cabinetry). U se w ood or plastic spacers to m aintain this expansion space.
R em ainder of Installation —
●
L a y su b se q u e n t ro w s b y u sin g o o r n a ile r to b lin d n a il to p in sid e e d g e o f to n g u e a t 4 5 ° a n g le . N a il e a c h b o a rd
e v e r y 8 ” a n d w ith in 2 ” o f e a c h e n d . R e m e m b e r to sta g g e r th e e n d jo in ts fro m ro w to ro w , a n d u se a ta p p in g
b lo c k to t b o a rd s to g e th e r.
●
It m ay be necessary to face-nail in doorw ays or tight areas w h ere the nailer w on't t; and
●
e la st tw o ro w s w ill n e e d to b e fa c e - n a ile d a s w ith th e rst tw o ro w s.
Prem ium H ardwood Flooring Installation Instructions
p.3
Example of Blind Nail
Example of Face Nail
G ettin g sta rted , con tin u ed
Y o u m a y w a n t to “d ry la y ” a fe w ro w s (n o g lu e o r n a ils) b e fo re sta rtin g in sta lla tio n to c o n rm y o u r la y o u t
d e c isio n s a n d w o rk in g lin e .
N ote: If o u tsid e w a ll is o u t o f sq u a re , a d ju st w o rk in g lin e to m a k e it stra ig h t fo r th e re st o f th e in sta lla tio n . Y o u
w ill n e e d to sc rib e th e rst ro w o f p la n k s to m a tc h th e w a ll a n d m a k e p o ssib le a stra ig h t w o rk in g lin e .
I n sta ll M e t h o d 1 – F lo a tin g
U nderlaym ent:
W e re c o m m e n d M P G lo b a l 'Q u ie tW a lk ' u n d e rla y m e n t. It re p la c e s th e n e e d fo r 6 - m il p o ly lm w h e n in sta llin g in
b e lo w - g ra d e c o n d itio n s. 'Q u ie tW a lk ' (a n d o th e r b ra n d s) h a s a 2 ' (5 c m ) to n g u e ru n n in g a lo n g its le n g th . is
should overlap the second course of underlaym ent and be fastened w ith eith er duct tape or poly tape.
ere is n o need to face-nail the perim eter. e advantage of a oating installation is that it allow s the building to
se e k its o w n c o n d itio n in g /e x p a n sio n /c o n tra c tio n rh y th m . A llo w 3 /1 6 ”p e rim e te r sp a c in g to a llo w th e o o r to re a c t
to se a so n a l e n v iro n m e n ta l c h a n g e . O u r h a rd w o o d p la n k is c o n d itio n e d to 6 - 8 % m o istu re c o n te n t, a n d a s su c h , is
lik e ly th e m o st sta b le c o m p o n e n t in th e b u ild in g a sse m b ly.
●
S ta rt th e rst ro w w ith th e g ro o v e sid e to n g u e - o u t; th a t is, fa c in g th e w a ll;
●
G lu e e n d jo in t o f rst ro w b y a p p ly in g a d h e siv e to th e bottom o f th e g ro o v e ;
●
A lw ays leave 1/4” expansion betw een ooring and all w alls and vertical objects
(pipes, cabinetry). U se w ood or plastic spacers to m aintain this expansion space;
●
L a y su b se q u e n t ro w s o f o o rin g b y a p p ly in g g lu e to sid e a n d e n d jo in ts, a n d
ttin g p la n k s w ith ta p p in g b lo c k . R e m e m b e r to sta g g e r e n d jo in ts fro m ro w
●
t o r o w .
I n sta ll M e t h o d 2 – N a il D o w n
I n s ta llin g r s t a n d s e c o n d r o w s —
●
L a y o o rin g p e rp e n d ic u la r to o o r jo ists, u n le ss su b o o r is e x istin g h a rd w o o d a n d /o r h a s b e e n stre n g th e n e d to
prevent sagging;
●
L a y rst p la n k in sid e c h a lk lin e w ith g ro o v e d e d g e to w a rd w a ll (to n g u e o u t). P re - d rill 1 - 1 /2 ” fro m g ro o v e d e d g e
a n d a b o u t 8 ” a p a rt. S e c u re p la n k s w ith n ish n a ils;
●
U se n a il p u n c h to c o u n te rsin k n a ils, a n d ll w ith w o o d lle r. R e p e a t o n to n g u e e d g e o f p la n k ;
●
Install entire rst and second row in this m anner. A lw ays leave 1/4” expansion s pace betw een ooring and all
w alls and vertical objects (pipes, cabinetry). U se w ood or plastic spacers to m aintain this expansion space.
R em ainder of Installation —
●
L a y su b se q u e n t ro w s b y u sin g o o r n a ile r to b lin d n a il to p in sid e e d g e o f to n g u e a t 4 5 ° a n g le . N a il e a c h b o a rd
e v e r y 8 ” a n d w ith in 2 ” o f e a c h e n d . R e m e m b e r to sta g g e r th e e n d jo in ts fro m ro w to ro w , a n d u se a ta p p in g
b lo c k to t b o a rd s to g e th e r.
●
It m ay be necessary to face-nail in doorw ays or tight areas w h ere the nailer w on't t; and
●
e la st tw o ro w s w ill n e e d to b e fa c e - n a ile d a s w ith th e rst tw o ro w s.
Prem ium H ardwood Flooring Installation Instructions
p.3
Example of Blind Nail
Example of Face Nail
G ettin g sta rted , con tin u ed
Y o u m a y w a n t to “d ry la y ” a fe w ro w s (n o g lu e o r n a ils) b e fo re sta rtin g in sta lla tio n to c o n rm y o u r la y o u t
d e c isio n s a n d w o rk in g lin e .
N ote: If o u tsid e w a ll is o u t o f sq u a re , a d ju st w o rk in g lin e to m a k e it stra ig h t fo r th e re st o f th e in sta lla tio n . Y o u
w ill n e e d to sc rib e th e rst ro w o f p la n k s to m a tc h th e w a ll a n d m a k e p o ssib le a stra ig h t w o rk in g lin e .
I n sta ll M e t h o d 1 – F lo a tin g
U nderlaym ent:
W e re c o m m e n d M P G lo b a l 'Q u ie tW a lk ' u n d e rla y m e n t. It re p la c e s th e n e e d fo r 6 - m il p o ly lm w h e n in sta llin g in
b e lo w - g ra d e c o n d itio n s. 'Q u ie tW a lk ' (a n d o th e r b ra n d s) h a s a 2 ' (5 c m ) to n g u e ru n n in g a lo n g its le n g th . is
should overlap the second course of underlaym ent and be fastened w ith eith er duct tape or poly tape.
ere is n o need to face-nail the perim eter. e advantage of a oating installation is that it allow s the building to
se e k its o w n c o n d itio n in g /e x p a n sio n /c o n tra c tio n rh y th m . A llo w 3 /1 6 ”p e rim e te r sp a c in g to a llo w th e o o r to re a c t
to se a so n a l e n v iro n m e n ta l c h a n g e . O u r h a rd w o o d p la n k is c o n d itio n e d to 6 - 8 % m o istu re c o n te n t, a n d a s su c h , is
lik e ly th e m o st sta b le c o m p o n e n t in th e b u ild in g a sse m b ly.
●
S ta rt th e rst ro w w ith th e g ro o v e sid e to n g u e - o u t; th a t is, fa c in g th e w a ll;
●
G lu e e n d jo in t o f rst ro w b y a p p ly in g a d h e siv e to th e bottom o f th e g ro o v e ;
●
A lw ays leave 1/4” expansion betw een ooring and all w alls and vertical objects
(pipes, cabinetry). U se w ood or plastic spacers to m aintain this expansion space;
●
L a y su b se q u e n t ro w s o f o o rin g b y a p p ly in g g lu e to sid e a n d e n d jo in ts, a n d
ttin g p la n k s w ith ta p p in g b lo c k . R e m e m b e r to sta g g e r e n d jo in ts fro m ro w
●
t o r o w .
I n sta ll M e t h o d 2 – N a il D o w n
I n s ta llin g r s t a n d s e c o n d r o w s —
●
L a y o o rin g p e rp e n d ic u la r to o o r jo ists, u n le ss su b o o r is e x istin g h a rd w o o d a n d /o r h a s b e e n stre n g th e n e d to
prevent sagging;
●
L a y rst p la n k in sid e c h a lk lin e w ith g ro o v e d e d g e to w a rd w a ll (to n g u e o u t). P re - d rill 1 - 1 /2 ” fro m g ro o v e d e d g e
a n d a b o u t 8 ” a p a rt. S e c u re p la n k s w ith n ish n a ils;
●
U se n a il p u n c h to c o u n te rsin k n a ils, a n d ll w ith w o o d lle r. R e p e a t o n to n g u e e d g e o f p la n k ;
●
Install entire rst and second row in this m anner. A lw ays leave 1/4” expansion s pace betw een ooring and all
w alls and vertical objects (pipes, cabinetry). U se w ood or plastic spacers to m aintain this expansion space.
R em ainder of Installation —
●
L a y su b se q u e n t ro w s b y u sin g o o r n a ile r to b lin d n a il to p in sid e e d g e o f to n g u e a t 4 5 ° a n g le . N a il e a c h b o a rd
e v e r y 8 ” a n d w ith in 2 ” o f e a c h e n d . R e m e m b e r to sta g g e r th e e n d jo in ts fro m ro w to ro w , a n d u se a ta p p in g
b lo c k to t b o a rd s to g e th e r.
●
It m ay be necessary to face-nail in doorw ays or tight areas w h ere the nailer w on't t; and
●
e la st tw o ro w s w ill n e e d to b e fa c e - n a ile d a s w ith th e rst tw o ro w s.
Prem ium H ardwood Flooring Installation Instructions
p.3
Example of Blind Nail
Example of Face Nail
G ettin g sta rted , con tin u ed
Y o u m a y w a n t to “d ry la y ” a fe w ro w s (n o g lu e o r n a ils) b e fo re sta rtin g in sta lla tio n to c o n rm y o u r la y o u t
d e c isio n s a n d w o rk in g lin e .
N ote: If o u tsid e w a ll is o u t o f sq u a re , a d ju st w o rk in g lin e to m a k e it stra ig h t fo r th e re st o f th e in sta lla tio n . Y o u
w ill n e e d to sc rib e th e rst ro w o f p la n k s to m a tc h th e w a ll a n d m a k e p o ssib le a stra ig h t w o rk in g lin e .
I n sta ll M e t h o d 1 – F lo a tin g
U nderlaym ent:
W e re c o m m e n d M P G lo b a l 'Q u ie tW a lk ' u n d e rla y m e n t. It re p la c e s th e n e e d fo r 6 - m il p o ly lm w h e n in sta llin g in
b e lo w - g ra d e c o n d itio n s. 'Q u ie tW a lk ' (a n d o th e r b ra n d s) h a s a 2 ' (5 c m ) to n g u e ru n n in g a lo n g its le n g th . is
should overlap the second course of underlaym ent and be fastened w ith eith er duct tape or poly tape.
ere is n o need to face-nail the perim eter. e advantage of a oating installation is that it allow s the building to
se e k its o w n c o n d itio n in g /e x p a n sio n /c o n tra c tio n rh y th m . A llo w 3 /1 6 ”p e rim e te r sp a c in g to a llo w th e o o r to re a c t
to se a so n a l e n v iro n m e n ta l c h a n g e . O u r h a rd w o o d p la n k is c o n d itio n e d to 6 - 8 % m o istu re c o n te n t, a n d a s su c h , is
lik e ly th e m o st sta b le c o m p o n e n t in th e b u ild in g a sse m b ly.
●
S ta rt th e rst ro w w ith th e g ro o v e sid e to n g u e - o u t; th a t is, fa c in g th e w a ll;
●
G lu e e n d jo in t o f rst ro w b y a p p ly in g a d h e siv e to th e bottom o f th e g ro o v e ;
●
A lw ays leave 1/4” expansion betw een ooring and all w alls and vertical objects
(pipes, cabinetry). U se w ood or plastic spacers to m aintain this expansion space;
●
L a y su b se q u e n t ro w s o f o o rin g b y a p p ly in g g lu e to sid e a n d e n d jo in ts, a n d
ttin g p la n k s w ith ta p p in g b lo c k . R e m e m b e r to sta g g e r e n d jo in ts fro m ro w
●
t o r o w .
I n sta ll M e t h o d 2 – N a il D o w n
I n s ta llin g r s t a n d s e c o n d r o w s —
●
L a y o o rin g p e rp e n d ic u la r to o o r jo ists, u n le ss su b o o r is e x istin g h a rd w o o d a n d /o r h a s b e e n stre n g th e n e d to
prevent sagging;
●
L a y rst p la n k in sid e c h a lk lin e w ith g ro o v e d e d g e to w a rd w a ll (to n g u e o u t). P re - d rill 1 - 1 /2 ” fro m g ro o v e d e d g e
a n d a b o u t 8 ” a p a rt. S e c u re p la n k s w ith n ish n a ils;
●
U se n a il p u n c h to c o u n te rsin k n a ils, a n d ll w ith w o o d lle r. R e p e a t o n to n g u e e d g e o f p la n k ;
●
Install entire rst and second row in this m anner. A lw ays leave 1/4” expansion s pace betw een ooring and all
w alls and vertical objects (pipes, cabinetry). U se w ood or plastic spacers to m aintain this expansion space.
R em ainder of Installation —
●
L a y su b se q u e n t ro w s b y u sin g o o r n a ile r to b lin d n a il to p in sid e e d g e o f to n g u e a t 4 5 ° a n g le . N a il e a c h b o a rd
e v e r y 8 ” a n d w ith in 2 ” o f e a c h e n d . R e m e m b e r to sta g g e r th e e n d jo in ts fro m ro w to ro w , a n d u se a ta p p in g
b lo c k to t b o a rd s to g e th e r.
●
It m ay be necessary to face-nail in doorw ays or tight areas w h ere the nailer w on't t; and
●
e la st tw o ro w s w ill n e e d to b e fa c e - n a ile d a s w ith th e rst tw o ro w s.
Prem ium H ardwood Flooring Installation Instructions
p.3
Example of Blind Nail
Example of Face Nail
p.3
• Start the rst row with the groove side tongue-out; that is, facing the wall;
• Glue end joint of rst row by applying PGWood approved adhesive to the bottom of
the groove;
• Always leave 1/4” expansion between ooring and all walls and vertical objects
(pipes, cabinetry). Use wood or plastic spacers to maintain this expansion space;
• Lay subsequent rows of ooring by applying glue to side and end joints, and tting
planks with tapping block. Remember to stagger end joints from row to row.
• Lay ooring perpendicular to oor joists, unless suboor is existing hardwood and/or has been strengthened to
prevent sagging;
• Lay rst plank inside chalkline with grooved edge toward wall (tongue out). Secure planks with nish nails.
• Use nail punch to countersink nails, and ll with wood ller.
• Install entire rst row in this manner. Always leave 1/4” expansion s pace between ooring and all
walls and vertical objects (pipes, cabinetry). Use wood or plastic spacers to maintain this expansion space.
Underlayment:
Use Suitable 6 mil rated ooring polylm for ooring installations when installing in below grade conditions.
Polylm should be overlapped at the seams and fastened with either duct tape or poly tape.
ere is no need to nail the perimeter. e advantage of a oating installation is that it allows the building to seek
its own conditioning/expansion/contraction rhythm. Allow 3/16” perimeter spacing to allow the oor to react to
seasonal environmental change. Our hardwood plank is conditioned to 6-8% moisture content, and as such, is
likely the most stable component in the building assembly.
Installing rst and second rows—
Remainder of Installation—
Install Method 2 – Nail Down
Example of Face Nail
Example of Blind Nail