Operator`s manual
Operator's Manual: Model CB-1400
4-2
Figure 4A - Typical Furnace Installation
CLEANOUT
WITH DRAIN
OIL
STORAGE
TANK
PRESSURE OIL LINE
WARNING: When installing your furnace,
adhere to the minimum clearances from
combustible surfaces as stated in Section 4.
These clearances also provide adequate
space for servicing. Failure to maintain
proper clearances may result in fire,
explosion, personal injury, or death.
ELECTRIC SERVICE
DEDICATED ELECTRIC CIRCUIT
OIL PUMP ELECTRICAL CIRCUIT
24 VOLT WALL
THERMOSTAT
"2 WIRE" MIN 18 GA.
THERMOSTAT CABLE
SETTING DRAFT.
ADJUST BAROMETRIC
DAMPER FOR −.04" W.C.
DRAFT AT BREECH
1/4" HOLE FOR
2 FT.
AIR INTAKE
OIL LINE
SUCTION
I88827
COMPRESSED AIR LINE
PRIME AND/OR THE FLOW RATE FROM
SUCTION LIFT OR THE PUMP WILL NOT
CAUTION: DO NOT EXCEED 6 FT VERTICAL
THE PUMP MAY DECREASE
GASOLINE FUMES IN YOUR SHOP. CHECK LOCAL CODES AND NFPA 88−B
8 FT. MIN. FROM FLOOR TO FURNACE IFTHERE IS A POTENTIAL FOR
10 FT. MINIMUM VERTICAL STACK HEIGHT PLUS 1 FT. FOR
EVERY FITTING TO MAINTAIN PROPER DRAFT OVERFIRE
10 FT.
BALL VALVE
MAXIMUM 6 FT.
VENT
CAP
EMERGENCY
VENT VALVE