Operator`s manual

Operator's Manual: Models CB-1500 & CB-2500 (230 V / 50 Hz)
3-1
SECTION 3: FURNACE ASSEMBLY
Understanding Assembly
Assembling your Clean Burn Furnace includes the following steps:
(1) Installing the Blower Assembly
(2) Installing the Hot Air Discharge Components
(3) Installing the Energy Retention Disc
(4) Installing the Burner
(5) Installing the Connector Block, Oil Line Tubing, and Air Line Tubing
Clean Burn recommends that you review all assembly procedures before proceeding, paying careful
attention to safety information statements.
Figure 3A on the following page provides a general overview of the furnace components and their
proper assembly.
Required Tools and Materials
The following tools are required for furnace assembly and should be gathered before starting any procedures:
3/8" open-end wrench
9/16" open-end wrench
Medium flat-blade screwdriver
Medium adjustable wrench
1/4" nut driver attachment for drill
Variable speed drill