Operator`s manual
Operator's Manual: Models CB-1500 & CB-2500 (230 V / 50 Hz)
4-24
Figure 4O - Installation of the Optional Draft Inducer on the CB-2500
(CB-1500 is similar)
Installing the Optional Draft Inducer (continued)
I88898
FURNACE OPERATION
SERVICEMAN ADJUSTS
DRAFT OVERFIRE
CHECK FOR −0.02 W.C.
BREECH SO THE MOTOR DOES NOT
DRAFT INDUCER AWAY FROM FURNACE
SECTION OF VERTICAL STACK TO POSITION
NOTE: INSTALL DRAFT INDUCER IN LAST
OVERHEAT. THIS ALSO REDUCES ASH
DO NOT MOUNT THE DRAFT INDUCER IN THE
HORIZONTAL STACK NEAR THE FURNACE
ACCUMULATION IN THE DRAFT INDUCER.
BREECH.
DRAFT INDUCER
ADJUSTMENT
PLATE
DRAFT
"CLASS A" STACK
(DOUBLE−WALL INSULATED
ALL−FUEL STACK )
BAROMETRIC DAMPER TO
OBTAIN −.02 W. C. DRAFT
OVERFIRE
FURNACE BREECH
INSTALLED ON L.H.
CLEAN−OUT CAP
SINGLE WALL
24 GAUGE INTERIOR STACK
1.5 m − 2.5 m
(5’ − 8’)
OPTIONAL
CONNECTOR BLOCK
AIR OIL
Danfoss
Type BHO 64
Nr. 057H7036
220-240V 50- 60Hz 3W
ts 10s