Operator`s manual

Operator's Manual: Models CB-1500 & CB-2500 (230 V / 50 Hz)
5-1
SECTION 5: METERING PUMP PRIMING
Understanding Metering Pump Priming
Preparing your Clean Burn furnace for operation begins with priming the metering pump. The
procedures in this section must be performed in sequence without interruption to properly prime the
pump.
Required Tools and Materials
The following tools and materials are required for oil pump priming and should be gathered before
starting any procedures:
3/8" open-end wrench
5/8" open-end wrench
Rags
Two containers (minimum one-gallon)
Permatex #2 non-hardening gasket sealer
Adjustable Wrench
Pipe Wrench