Specifications
IMPORTANT INFORMATION
READ CAREFULLY
All components of the solar thermal system must be installed in accordance with those 
installation  regulations  required  in  the  area  the  installation  is  to be  completed.  All 
regulations must  be adhered to in all  cases.   Consultation  with local authorities must 
be made before installation  is commenced.    Inspection  by a plumbing inspector  prior 
to final commissioning may also be required.
All installation work must be completed by licensed, suitably qualified and experienced 
installers.! The installer of the solar collector system must have attended an Authorized 
Apricus Training Session and be registered with Apricus.
If  you  have  NOT  attended  an Apricus training  session,  please contact your  local 
Apricus supplier to organize training or contact Apricus:
Email: office-usa@apricus.com
Phone: 877 458 2634
The following terms are used through this document to bring attention to the presence 
of  hazards  of  various  risk  levels or  to  important  information  concerning  product 
operation.
 WARNING
Indicates a potentially hazardous situation, which, if 
not avoided, could result in death, serious injury, or 
substantial property damage.
 NOTICE
Important information that must be read and 
understood and adhered to where applicable.
All referenced manuals are available in the OG-300 section of the Apricus website:
www.apricus.com
Apricus Solar Collector Installation & Operation Manual - USA
Copyright © 2011 – Apricus Inc Doc: A7-05.4.12-PB Page 2 of 129










