CLIFF —{ = JIl 3 EQUIP DISTANCE SPLINES TO MATCH FLATS ISS| AMEND DATE Ist DRAWN | 4/10/93 LOTS ADDED | 2/11/93 PEAK NOTE ADD | 10/6/%4 |AMEND TO PROD) 28/3/95 5TD POSE NOTE | 5/5/95 SHAFT DRAG No.| 25/6/96 (@NOTE ADDED [17/12/97 n o 6mm SPLINE SHAFT H@ 1.5 CORES TO BE LOCKABLE POSS @ 90° o MARKER LINE A TO LOCATE TO PEAK AND POSITION e 3 BOTTOM OF SPLINE LOCATED CENTRALLY 0.8 10> DIFFERENCE IN A FLAT 1,30 RAD 0.5 B TIP OF PEAKS 'A’ \LO‘ 7 TO RUN OUT FROM MEAN 7 0.