Installation and Operation Guide

3
Button/LED/Component Behavior
9. Programming Telephone
Jack
The programming cable (QT cable A) needs to be plugged
into this jack and connected to a PC for PC Programming.
10. Volume Adjustment Button Press the button to adjust the volume level. 5 levels are
available for selection.
Each button press will lead to next level.
The cycle of 1-5 will be repeated sequentially.
11. Learn Button Press and hold for 6
seconds in normal mode
Enter RF device learning
mode
Press once in learning
mode
Exit learning mode
2.2. Power Supply
An AC power adapter is required to connect to a wall outlet. Be sure only
to use an adapter with the appropriate AC voltage rating to prevent
component damage. A DC 12V output and 1A switching power adapter is
generally used to power CH-MG.
In addition to the adapter, there is a rechargeable battery inside CH-MG
which serves as a back-up in case of a power failure.
During normal operation, the AC power adapter is used to supply power to
CH-MG and at the same time recharge the battery. It takes approximately
72 hours to fully charge the battery.
After power is supplied to CH-MG, press the power button once to power
on the Control Panel.