Installation Guide

NO MORTAR
NO MESS
installation instructions
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Determining Amount of ClipStone
®
needed
NUMBER OF FLAT STONES (see Fig.1)
Calculate wall area to be covered with stone (height X width) and subtract area of window and door openings (if
applicable). Then add 5% - 10% additional stone material for waste due to cutting or breakage.
NUMBER OF CORNER STONES (see Fig. 2)
Measure the height of all corner edges to determine the total linear feet of corners needed. Add 5%-10% for waste. Also
subtract 50% of the corner linear feet from your at stone calculation to account for wall coverage of corners.
AMOUNT OF STARTER STRIP NEEDED (see Fig. 3)
Starter strips are required at the bottom of a wall or across the top of all windows, doors and other openings.
Measure the total lineal dimension of all window widths, door widths and the length of all walls to be stoned to calculate
the total linear feet of starter strip needed.
NUMBER OF OUTLET STONES
If you have electrical outlets in your wall or project space, count the number of outlets and order an Outlet Stone for
each outlet.
NUMBER OF DECORATIVE SILLS FOR WINDOWS
Measure lineal foot dimension of window sills needed under windows and to cap a wainscot.
Divide the total linear feet by 1.6 to calculate the number of pieces.
Tools Required
1” metal roong screw with a hex/washer
head and corrosion resistant coating
Screw gun
2 to 4 foot level
Small torpedo level
Slap stapler (for external applications to fasten
paper to wall)
Chop saw or other cutting tool
Before You Begin
FOR EXTERIOR WALL PREPARATION (see Fig. 4)
ClipStone is designed to install over 7/16 inch or greater OSB or plywood sheathing attached to wood or metal studs.
If any questions as to the structural integrity of the sheathing or framing, contact a qualied contractor or building
inspector.
Install two layers of Grade D Breathable Water Resistive Barrier over sheathing and fasten to wall with staples or
other means.
Ensure all paper edges are ashed to substrate to prevent moisture movement to back of WRB.
Ensure all openings and penetrations are properly ashed.
Ensure compliance to all local and national building codes as they change from location to location.
FOR INTERIOR WALL PREPARATION (see Fig. 5)
ClipStone is intended for installation over 7/16 inch minimum plywood or OSB.
DO NOT INSTALL CLIPSTONE DIRECTLY TO DRYWALL.
Install minimum 7/16 inch or greater OSB or plywood substrate to wood studs to act as substrate for ClipStone installation.
If any questions as to the structural integrity of the sheathing or framing, contact a qualied contractor or building inspector.
Insure plywood is attached to the structural studs behind the drywall in accordance with local and national codes.
For interior applications, Water Resistive Barrier or housewrap is not required.
How to cut stone (if needed)
ClipStone is easily cut both horizontally and vertically with
a chop saw. PLEASE WEAR APPROPRIATE CLOTHING,
GLOVES, EYE PROTECTION AND OTHER SAFETY
EQUIPMENT RECOMMENDED BY THE CUTTING TOOL
MANUFACTURER.
ClipStone installation requires two points of attachment per
piece for fastening to the substrate.
If this cannot be done, use DAP
®
DynaGrip
®
Heavy Duty Max
to adhere stone surfaces together where there is a difcult
area for attachment (i.e. under a soft)

Summary of content (2 pages)