Installation Guide
© 2020 The AMES Companies, Inc. | Orlando, FL 32827 | 1-800-874-0008 (USA, Canada) | www.closetmaid.com 3
Tower in center with hang rods on the left and right1
Assemble and build your towers rst. Place
your towers in the closet.
Choose which side you want the long hang
and the double hang to be, as you may
want a wider width of double hang.
Measure the length that the rods will need
to be for each side. Make sure that the span
between units or unit and wall is not greater
than 48 in.
Install the closet rods and top shelves (if
purchased for your design).
The top shelves and closet rods t a
maximum span of 48 in. The expandable
closet rods are 30 in. to 48 in. long. If the
length is shorter than 30 in. the rod will
need to be cut.
Assemble and install any doors and drawers into the tower unit.
A)
B)
C)
D)
E)
F)







