Installation Guide
© 2020 The AMES Companies, Inc. | Orlando, FL 32827 | 1-800-874-0008 (USA, Canada) | www.closetmaid.com 4
2Tower on left of closet – closet rods to the right
Assemble and build your towers rst.
Position the tower to the left of the closet.
Before attaching the tower to the wall make
sure the closet walls or doors do not block
access to the tower. Standard towers are
14.5 in. up to 16 in. deep and Hutch style
towers are up to 20 in. deep.
Attach the Tower to the wall. Choose
whether you want the long hang or the
double hang for the right hand side.
Measure the length that the rods will need
to be. Make sure that the span between
units or unit and wall is not greater than
48 in.
Install the closet rods and top shelves.
The top shelves and closet rods t a maximum span of 48 in. The expandable closet rods are
30 in. to 48 in. long. If the length is shorter than 30 in. the rod will need to be cut.
Assemble and install any doors and drawers into the tower unit.
A)
B)
C)
D)
E)
F)







