B) ABOVE GROUND SWIMMING POOL INSTALLATION
A CLUB PISCINE SUPER FITNESS PROFESSIONAL INSTALLER WILL CONTACT YOU, AND MAKE AN
APPOINTMENT TO GO OVER THE ACTUAL INSTALLATION OF YOUR IN GROUND SWIMMING POOL.
Please note that the initial start and/or completion date could be delayed due to inclement weather.
PLAN ONE INSTALLATION DAY FOR:
• Preparing the perimeter (compacting dirt) ;
• Compacting the bottom (sand and dirt) ;
• Assembling the frame ;
• Installing the liner ;
Installing the filter system and other equipment (heat pump, water heater, steps, ladder, etc.) ;
THE INSTALLER WILL ASK FOR PAYMENT DULY IN THE FORM OF A SIGNED CERTIFIED
CHEQUE OR FINANCING.
EXPECT EXTRA CHARGES FOR :
• Level differences of more than 6”
• Saucer depth of over 6”
• Removing soil and turf from your yard
• Removing stumps
• Installing a deck
• Installing a solar blanket roller
• Installing a water-heater with a bypass
• Connecting a gas line for a propane or natural gas water-heater
• Licensed electrician for electrical hook-up
• Removing sod
• Levelling the ground and digging the saucer (4 to 6 inches)
• Installing pool lights
SHOULD YOU DECIDE TO BUILD A DECK, CLUB PISCINE SUPER FITNESS RECOMMENDS THAT
YOU DO SO ONLY ONCE YOUR POOL HAS BEEN INSTALLED, AND THAT YOU ENSURE YOUR
POOL IS STILL EASILY ACCESSIBLE IN CASE ADDITIONAL WORK BE REQUIRED. IN ADDITION,
UNDER NO CIRCUMSTANCES SHOULD THE DECK OVERHANG THE POOL’S EDGE IN ORDER
TO PREVENT ACCIDENTS.