Instructions / Assembly

( 3 )
PARAGON BI-FOLD w/ Header 08/27/2015 * * * PATENTS PENDING
1. Measure base opening along center of shower curb as shown in figure 1. Trim
Sill (A) to 1/16” less than measurement obtained.
2. With weep holes toward interior of enclosure, position Sill at center of shower
curb. Temporarily tape Sill to shower curb to prevent movement.
3. Place Wall Jambs (C) into ends of Sill (A) and up against shower walls as shown
in figure 2. Plumb the Jambs, then pencil mark their installation holes locations on
shower walls (3 per jamb). Remove Wall Jambs. Using a 3/16” masonry bit, drill
1” deep installation holes in locations previously marked. Insert Plastic Screw
Anchors (N) into holes.
4. Reposition Wall Jambs (C) as before and secure Jambs to walls using the six(6)
1-1/4” Installation Screws provided (3 per jamb).
INSTALLATION INSTRUCTIONS
PARTS
figure 2
MEASURE BASE OPENING
figure 1
YEKTRAP
RETTELREBMUNNOITPIRCSEDYTQ
A009LLIS1
B149REDAEH/LLIS,KCARTEDIUG2
C309BMAJLLAW2
D629TSOPEKIRTS1
EYLBMESSAROOD
1e029tsoPe
gniH1
2e229elitSegniH3
3e429elitsekirtS1
4e529liaR4
5e049lluPegniHretneC1
6e73eceiPedilS2
7e239PC)nwohston(sniPegniH6
8eWT841PC)n
wohston(rehsaWegniH6
9eB129C)nwohston(eveelSegniH3
01eB049C)nwohston(lyniVgnizalG---
11e24-89)nwohston(pirtScitengaM1
21ePHF4118-7swercSylbmessAlenaProoD8
FYLBMESSALIARPIRD
1f0432liaRpirD2
2fB671CpeewSrooDlyniV2
3f3044)dellatsni(epa
TliarpirD2
G039)tes(ELDNAHROOD1
HPHFSM4116SWERCSELDNAHROOD2
IYLBMESSAREDLOHTENGAM
1i249redloHtengaM1
2i54-89tengaM1
JMB981
PS).D.O"8/3x"4/3(GNIHSUB2
KPHF2318WERCSGNIHSUB2
LXEH85238WERCSTES2
MPHP4118-6SWERCSNOITALLATSNI6
N9231SROHCNAWERCSCITS
ALP6
OTPHP836SWERCSTNEMTSUJDA51
P539PCETALPEKIRTS1
QB611PS).D.O"61/5x"2/1(POTSROOD2
R436)"4/3x6#(WERCSPOTSROOD2
S009REDAE
H1
T24-89)EKIRTS(PIRTSTENGAM1