Installation Guide

4
STEP 7 Towel Bar Installation
STEP 8 Leak Proof Installation
To insure a leak proof installation . . . Run a bead of clear mildew
resistant caulking down the full length of each Wall Jamb outside
where the Wall Jambs meet the walls. Now caulk the crevise
where the sill meets either Wall Jamb. Follow caulking
manufacturer's instructions before using shower. Installation is
now complete.
ENJOY!
STEP 6 Door Panel Installation
Install the outside Door Panel (D) by Lifting Panel up and into the
Header (A). Lower Panel into the Track Guide (P) and engage
the Rollers (I) with the roller track.
Slide outside Door Panel into Wall Jamb located on wall opposite
of shower head. Check Panel to make sure that it is parallel to
the Wall Jamb. If it is not, remove the Door Panel and adjust the
rollers either up or down by loosening the Roller Screws and
sliding the Rollers. When satisfied with outside Door Panel
alignment, proceed with inside Door Panel installation.
When installed, slide inside Door Panel into Wall Jamb located on
shower head wall and check for alignment with Wall Jamb.
Adjust Rollers as necessary.
D
I
A
D
I
FIGURE 7A
(SHOWER HEAD ON LEFT)
FIGURE 7B
(SHOWER HEAD ON RIGHT)
E
BRACKETS FIRST
INSTALL INNER
E
SHOWER HEAD WALL
E
INSTALL INNER
BRACKETS FIRST
E
SHOWER HEAD WALL
Close Door Panels (inside Panel against shower head wall and
outside Panel against opposite wall). See figures 7A and 7B.
Note that both inner Brackets must be installed first. Do so at this
time and secure to Panels with a #832 x 3/4" Towel Bar Screw (F).
Now finish Towel Bar installation for each Door Panel as shown in
exploded view and secure with a #832 x 1-1/4 Towel Bar Screw
(K). Don't forget the Finger Pulls (E).
Finish Towel Bar installation by pealing the back off the metallic CI
logo (V) and installing it over the screw head on the Finger Pulls
(E) as shown in exploded view - front sheet.
SILL
JAMB