Installation Guide
Table Of Contents
- 1. About this Manual
- 2. Product Overview
- 3. Radio Node Model
- 4. Connectors, SFP+ and Micro-USB Ports, and Status LED
- 5. System Specifications
- 6. Compliance
- 7. Mounting the Radio Node
- Always consult and follow local codes for mounting and wiring Corning equipment.
- 7.1 Flush Mounting the SCRN-510
- The security screws should not need to be adjusted but if they do, loosen them slightly to be able to slide the ceiling-mount bracket on and off.
- The shoulder screws should not need to be adjusted but if they do, loosen them slightly to be able to slide the ceiling-mount bracket on and off.
- Corning recommends that you use a customer-supplied projector mount when hanging the SCRN-510 from a dropped T-bar ceiling.
- 7.2 Downtilt Mounting the SCRN-510
- 8. Cabling Guidelines
- 9. Completing the Installation
- 10. Detaching the Radio Node from the Mounting Brackets
- 11. Radio Node LED Boot Sequence
- 12. Radio Node LED Management
- 13. Corning Documentation Set
Corning Restricted and Confidential Proprietary - Controlled content
SCRN-510 Hardware Installation Guide | DOC-SCRN-510-HIG_i4 | 16 October, 2020 | Page 12
Figure 7 Ceiling-Mounted SCRN-510
7.2 Downtilt Mounting the SCRN-510
The SCRN-510 comes with the ceiling-mount bracket attached, and has the multi-angle wall-mount bracket
loose in the box. Figure 8 shows the SCRN-510 wall-mount bracket.
Figure 8 SCRN-510 Wall-Mount Bracket
When using the multi-angle wall-mount bracket, it is not necessary to remove the ceiling-mount bracket
from the SCRN-510; the wall-mount bracket attaches to the wall, and then it attaches to the ceiling-mount
bracket-and-radio node assembly. Figure 9 shows how the wall-mount bracket attaches to the ceiling-mount
bracket.










