Technical data
14.1
CONTROLS TO 
OPERATE THE CRANE
GR2_60ยป65_3_4
VERSION WITH VERTICAL CONTROLS
(!) ATTENTION (!)
The sequence of the plates placed on the crane controls may be different.
Make sure that the lever you are going to operate correspond to the control 
you selected. 
(!) Operate the levers smoothly and gradually (!) 
When carrying out simultaneous movements of two or more functions, 
also related to pump flow and lever travel, it is possible that on reaching 
the stroke end of a particular function, an increase in speed of the other 
functions will occur.
(!) ATTENTION (!)
While exiting and folding the crane, you must operate from the 
distributor side; it is forbidden to operate from the double control 
side because of the overall dimensions of the booms. (DE1684A fig. 
15)
fig. 15
CRANE CONTROLS
IMPLEMENTS CONTROLS
1 Additional function
IMPLEMENTS CONTROLS
2 Additional functions
IMPLEMENTS CONTROLS
2 Additional functions
IMPLEMENTS CONTROLS
3 Additional functions
 Rotation  Inner  Outer  Extension
  boom  boom  booms
  Jib  Jib
  outer  extension
  boom  booms
  Jib  Jib  Winch
 outer   extension
  boom  booms
  Rotator  Bucket
 Winch  Bucket










