Specifications

LWLCWH COLUMBIA BOILER COMPANY REV. 13106
7
BURNER MOUNTING
If the burner is to be installed on site, first apply a gasketing material between the burner flange and
the burner mounting plate to seal the burner. Use a non-asbestos fiber rope, or a wet insulating mate-
rial for a gasket, as shown in Figure 2. Wet insulation is the preferred gasketing material because it
compresses into a flat gasket which conforms to and fills any and all voids. Secure the burner in the
boiler using the four bolts supplied with the burner. See the Burner Section of this manual for proper
electrical wiring, and fuel supply piping.
Note: All factory packaged boilers use a wet insulation material as a gasket.
Figure 2