Specifications

LWLCWH COLUMBIA BOILER COMPANY REV. 13106
6
COLUMBIA BOILER COMPANY OF POTTSTOWN SHALL NOT BE HELD LIABLE FOR DAMAGE
TO THE BOILER CAUSED BY INCORRECT VENT CONDITIONS AND/OR INSUFFICIENT BURN-
ER MAKEUP AIR.
JACKET ASSEMBLY
Assemble the jacket kit around the boiler as shown in Figure 1. Place each panel against its respec-
tive side of the boiler.
NOTE: The side panels for boiler Models WL-120, WL-140 and WL-180 are two piece side
walls. Assemble these side wall pieces together before proceeding with jacket
installation.
Assemble the lower front panel to one side wall at a time. Next, attach the lower rear panel to each
side wall of the boiler. When applicable, mount the upper front and rear panels in their respective
locations. Attach the joiner plate behind the lower portion of the lower front panel as shown. Finally,
assemble the top right and left jacket panels on top of the boiler. Attach these panels to the previ-
ously assembled jacket components. If necessary, prepipe the top of the boiler before assembling the
top jacket panels. The top jacket panels are designed to allow prepiping to the top center boiler fit-
tings, if needed.
Figure 1