User's Manual

USER MANUAL FOR MBDA-80
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 44
Step 3: Click , users can set the site information.
Figure 49: Dev Info & Date/Time
Dev Info mainly used to record device location and Date/Time provid a time reference. Click the Config
Value of Date/Time, will update Date/time automatically.
NOTE: Make sure the device is connected with appropriate donor and service antennas before
proceeding to step 4.
Step 4: Click to enter to Isolation Detection Screen shown as Figure 51
Select a frequency band (RFU) that need to commission.
Click
to start Isolation Detecting, then [Confirm] window will pop-up shown as Figure
53.
Click
to continue. If isolation detection success, the process will go to RF Settiing
Screen shown as Figure 55. If failed, a Tips window will pop-up shown as Figure 54, users
need to check whether the system isolation is very weak.
NOTE: At the end of first frequency band commissioning, user can start other frequency band
commission.
Figure 50: Commissioning Procedure Isolation Detective