User Manual

INSTALLATION GUIDE FOR RX7W22
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 33
Step 2: Click to start the process.
Figure 31: Commissioning Procedure Site Info. Setting
Step 3: Click , users can set the site information.
Figure 32: Dev Info & Date/Time
Dev Info mainly used to record device location and Date/Time provides a time reference. Click the Config
Value of Date/Time, will update Date/time automatically.
NOTE: Make sure the device is connected with appropriate donor and service antennas before
proceeding to step 4.
Step 4: Click to enter to Isolation Detection Screen shown as Figure 52.
Select a frequency band (RFU) that need to commission.
Click to start Isolation Detecting, then [Confirm] window will pop-up shown as Figure
53.