User's Manual

INSTALLATION GUIDE FOR UHF DAS
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 25
Figure 13: Dimension of Expansion Unit for Cabinet Mounting
Cabinet installation:
The installation cabinet is a standard cabinet. The size of the Expansion Unit is the equipment used in the 2U
cabinet. The cabinet needs to have enough space to install the 2U cabinet, and have self-prepared structural parts
with pallets and M6 buckle nuts.
The installation steps are as follows:
Adjust the 2U space on the upper side of the free pallet of the cabinet, install the square holes on the left and right
columns, and install M6 snap nuts in the four holes with a spacing of 76.2mm;
Complete the external wiring connection of the equipment according to the equipment port and wiring
requirements;
Push the equipment into the cabinet along the pallet, align the mounting ear mounting holes of the equipment with
the corresponding square holes of the cabinet [with M6 nuts], and use a "cross screwdriver" to set the " M6" in the
packing box of the equipment ×10, "Combination screw (T)" passes through the hanging ears and fastens to the
"M6 snap nut";
Use the yellow-green ground wire in the accessories to reliably connect the equipment ground terminal and the
ground bar of the machine room;
The installation is complete.