Chapter 13 Loopback testing backhaul links
168 Release 2.0, 910056 Rev01d
Removing physical loopbacks
This procedure explains the steps to restore the system to normal operational mode after loopback testing is
complete.
1. Remove all external, physical loopbacks installed earlier.
This procedure is complete. The loop back testing process is also complete. Go to Understanding the
commissioning completion process on page 188.
CAUTION
Failure to remove any loopbacks installed earlier results in failed
backhaul links.