User Manual

Completing the sector’s transmit power calibration process
IP-RN 8000 Installation & Commissioning Guide 183
If the sector’s calibration is successful, go to Completing the sectors transmit power calibration process
on page 183.
If the sector’s calibration is not successful, go to Measuring power loss for the sector
on page 180.
Completing the sector’s transmit power calibration process
This procedure explains how to stop FTAP for the sector and remove test equipment in preparation for
calibrating the next sector or completing the entire calibration process, as appropriate.
Requirements
If you assembled your own jumper cables using different connectors, you need appropriate, site-specific
tools.
13/16 inch open ended wrench
Torque wrench with 13/16 inch open ended bit
30 dB attenuator pad with connector appropriate for antenna jumper cable
Power meter with connector appropriate for antenna jumper cable
An operational CLI/serial session to the active BIO/SC module
See Establishing the CLI/serial connection on page 153.
Warnings
WARNING
Antenna cables emit radio frequency energy. Exposure to radio
frequency energy can cause burns or other health problems. Take
all appropriate precautions to avoid risk and danger.
Do not touch or disconnect antennas when there is any chance of
a lightning strike. Injury or death can occur if lightning strikes an
antenna during installation.