User Manual
Blossoming and enabling all sectors
IP-RN 8000 Installation & Commissioning Guide 185
Blossoming and enabling all sectors
This procedure explains how to restart transmission (blossom) for all sectors deployed on the node. This
procedure is only followed after all sectors have been calibrated and all test equipment is removed.
Requirements
• An operational CLI/serial session to the active BIO/SC module
• See Establishing the CLI/serial connection on page 153.
Procedure
1. If sector 1 (alpha) is deployed on the node, set the power transmission level to the figure specified by
network planners and blossom the transmission as follows:
AIRVANA-03>enable
AIRVANA-03#configure
AIRVANA-03(config)#sector-element element1/4/1
AIRVANA-03(config-element)#tx-power <specified by network planners>
AIRVANA-03(config-element)#no shutdown
AIRVANA-03(config-element)#exit
AIRVANA-03(config)#exit
AIRVANA-03#exit
AIRVANA-03>
2. If sector 2 (beta) is deployed on the node, set the power transmission level to the figure specified by
network planners and blossom the transmission as follows:
AIRVANA-03>enable
AIRVANA-03#configure
AIRVANA-03(config)#sector-element element1/4/2
AIRVANA-03(config-element)#tx-power <specified by network planners>
AIRVANA-03(config-element)#no shutdown
AIRVANA-03(config-element)#exit
AIRVANA-03(config)#exit
AIRVANA-03#exit
AIRVANA-03>
WARNING
Do not blossom and enable sectors unless all calibration is
complete, all test equipment is removed, and all antennas are
reconnected.