Chapter 15 Completing commissioning
188 Release 2.0, 910056 Rev01d
Understanding the commissioning completion process
This process explains the steps you must take to complete the commissioning process.
1. Checking the status of all modules with CLI
See Checking the modules with CLI
on page 188
2. Disconnecting the Laptop
See Disconnecting the laptop
on page 189
3. Ensuring the cabinet is prepared for your departure
See Preparing the cabinet for your departure
on page 189
4. Ensuring the site is prepared for your departure
See Preparing the site for your departure
on page 190
This is the end of the commissioning phase. Now that installation and commissioning is complete, you are
done with this book. The next phase is network integration, in which network-wide connectivity tests are
performed and other steps are taken to ensure network operation.
Checking the modules with CLI
This procedure explains how to check the node to ensure all modules are operational. It is assumed you have
an open CLI session to the active BIO/SC module.
1. Enter the following command to display a report showing the status of all modules:
AIRVANA-03>show module
The following displays:
Name Contains Status Up Time
slot1/1 radio1/1/1 Active 000d:00h:02m:14s
slot1/2 tfu1/2/1 Active 000d:00h:02m:14s
slot1/3 sc1/3/1 Active 000d:00h:02m:18s
slot1/4 modem1/4/1 Active 000d:00h:02m:14s
slot1/5 radio1/5/1 Active 000d:00h:02m:14s
slot1/6 tfu1/6/1 Active 000d:00h:02m:14s
slot1/7 sc1/3/1 Ative 000d:00h:02m:14s
slot1/8 modem1/8/1 Active 000d:00h:02m:14s
slot1/9 radio1/9/1 Active 000d:00h:02m:14s
Every module in the network element is listed with a status of Active.