User Manual
About this guide
xiv Release 2.0, 910056 Rev01d
Purpose
This guide provides detailed processes and procedures required to install and commission an IP-RN 8000.
Audience
This guide should be read by network planners in order to understand the installation and commissioning
process and requirements. This guide should be used by field technicians to install and commission nodes at
cell sites.
Field technicians installing nodes must be able to use the following:
• Common tools such as screwdrivers and wrenches
• Torque wrench
• Thread tapping kits
• Crane for lifting the cabinet onto the concrete pad
• 66-punch blocks
Field technicians commissioning nodes must use a variety of software applications, including:
• Window 98 (at least)
•FTP
• HyperTerminal or an equivalent terminal emulation program.
They must also be able to understand serial connections, CLI node management, telnet, and Ethernet
connections.