Chapter 4 Installing the cabinet, power, and ground
58 Release 2.0, 910056 Rev01d
3. Physically push down on each bolt forcing it out of the bottom of the pallet.
This procedure is complete. Go to Placing the cabinet on the concrete pad
on page 58.
Placing the cabinet on the concrete pad
This procedure explains how to place the cabinet on its insulation pad and concrete pad or floor.
Be sure you have read and understood Understanding the cabinet installation process
on page 50 before
continuing.
Requirements
Insulation pad shipped with the IP-RN 8000
Four eye bolts that were shipped with the IP-RN 8000 (used to lift the cabinet)
Crane sufficient to safely lift the 500 pound IP-RN 8000
CAUTION
Do not open the door, or push on, or lean against the cabinet. The
cabinet cab can tip over and cause death, injury, and equipment
damage. Do not move the palette after removing the anchor bolts.
NOTE
This step requires two people to ensure safety and to protect
equipment from damage.