User Manual

Placing the cabinet on the concrete pad
IP-RN 8000 Installation & Commissioning Guide 59
Procedure
1. Lay the insulation pad that was shipped with the IP-RN 8000 on the concrete pad.
Ensure the four bolts embedded in the concrete pad or floor stick up through the holes at the corners of
the insulation pad. Ensure the pad lays flat and is not wrinkled or folded.
2. Ensure the cabinet door is closed and latched.
See Closing the door
on page 199.
3. Screw the four eye bolts into the top of the cabinet.
Ensure the eye bolts are screwed in snugly.
The eye bolts are shipped with the cabinet.
WARNING
The IP-RN 8000 is now disconnected from the palette. Do not
open the door, or push on or lean against the cabinet as it may tip
over causing equipment damage, injury, or death. Do not move
the palette.
CAUTION
Proper placement of this pad is essential to prevent corrosion.
CAUTION
The quality of the concrete must meet 3000-pound per square
inch (psi) concrete specifications and should be at least 8 inches
thick to achieve the design requirement for wind and seismic
loading.
WARNING
Failure to screw the eye bolts in all the way could cause them to
fall out during lifting and this could cause death, injury, or
equipment damage.
Rubber insulation
Concrete pad
Anchoring bolts