User Manual

Placing the cabinet on the concrete pad
IP-RN 8000 Installation & Commissioning Guide 61
5. With one person operating the crane and another holding the access panel out of the way and aligning
the cabinet as the cabinet is lowered, lift the IP-RN 8000 off the pallet and lower it onto the concrete
pad, ensuring the following:
The four corner bolts stick up through the four bolt holes in the base of the enclosure.
No part of the IP-RN 8000 enclosure has direct contact with the concrete. The insulation pad
should be visible all the way around the cabinet.
This procedure is complete. Go to Bolting the cabinet in place
on page 62.
NOTE
In the following steps, one person should operate the lift and the
other person should hold the backed away access panel up and
out of the way and help align the cabinet with the four anchor
bolts in the concrete pad as the cabinet is lowered into place.
CAUTION
When lowering the cabinet onto the pad, take special care not to
damage the threads on the anchor bolts. These four anchor bolts
are essential to a successful installation.
Rubber insulation
Concrete pad
Anchoring bolts
Left side access
panel removed
Right side access
panel backed away