User Manual
Table Of Contents
- Contents
- List of figures
- List of tables
- About this document
- ipBTS system overview
- Planning
- ipBTS C30 installation
- RN commissioning
- Requirements
- CLI connection
- Establishing a console connection
- Connecting the laptop to the ipBTS C30
- Downloading and activating new software
- Verifying SNTP time
- Commissioning the ipBTS C30
- Performing Loopback tests
- The loopback test process
- Backhaul loopback testing
- Ethernet loopbacks
- Looping back Ethernet backhaul links
- Looping back at the Ethernet port
- Entering diagnostic mode and configuring test parameters
- Performing external loopback tests on backhaul links
- Troubleshooting failed backhaul links
- Removing physical loopbacks
- Configuring IP on the Ethernet port and laptop
- Establishing the CLI/SSH/Ethernet connection
- Updating node software
- RN hardware components
- RN Specifications
- Hot-swapping ipBTS hardware
- Index
List of tables
1 910136 Rev01.00 Standard July 2007
List of tables
Table 1-1. RN shelf replaceable components ........................................................................ 1-4
Table 1-2. Replaceable RN modules...................................................................................... 1-4
Table 2-1. Input power interfaces .......................................................................................... 2-1
Table 2-2. ipBTS operating and storage temperature specification....................................... 2-2
Table 2-3. ipBTS humidity specifications ............................................................................. 2-2
Table 2-4. ipBTS altitude specification ................................................................................. 2-3
Table 4-1. Required hardware................................................................................................ 4-4
Table 4-2. Required software................................................................................................. 4-5
Table 4-3. Configuration parameters ..................................................................................... 4-6
Table 4-4. Backhaul links to be tested ................................................................................. 4-16
Table 4-5. Specifying backhaul links for internal loopback mode ...................................... 4-17
Table 4-6. Specifying backhaul links to be tested ............................................................... 4-18
Table 4-7. Terminal settings for CLI/serial connection....................................................... 4-20
Table A-1. Physical and environmental specifications......................................................... A-1
Table A-2. Power specifications ........................................................................................... A-2
Table A-3. Input power interfaces ........................................................................................ A-2
Table A-4. Module specifications......................................................................................... A-3
Table A-5. GPS antenna specifications................................................................................. A-3
Table A-6. T1/E1 connector pin assignments....................................................................... A-3
Table A-7. 100BaseT connector pin assignments................................................................. A-4
Table A-8 Craft port interface pin assignments .................................................................... A-5