User Manual

Table Of Contents
Airvana ipBTS C30 Installation and Commissioning, Release 4.0 2-1
Chapter 2
Planning
Installing and commissioning a ipBTS C30 involves some preparation. This chapter discusses
preparation and has the following sections:
Requirements on page 2-1
Power requirements on page 2-1
Ground requirements on page 2-2
Environmental requirements on page 2-2
Requirements
This chapter describes the requirements for installation of an ipBTS system. It contains
information about:
Input power interfaces on page 2-1
ipBTS operating and storage temperature specification on page 2-2
ipBTS humidity specifications on page 2-2
ipBTS altitude specification on page 2-3
Power requirements
The ipBTS C30 requires only one power supply but supports dual DC input power feeds for
power redundancy. Table 2-1 provides the voltage specifications for input power.
Table 2-1. Input power interfaces
Terminals Functions
-48VDC-A Input power, -48VDC
Input power feed A
-48RTN-A Input power, -48VDC return
Input power feed A