Users Manual Part 2

Appendix D Field Replaceable Units
ONECELL
®
Hardware Installation, Release 5.5 D-85
D
R
A
F
T
7 The operational state of the RP can be determined by the LED status on the RP.
Additional information can be attained from the WebGUI status screens.
For verification procedures, see RP post-replacement verification.
RP post-replacement verification
The operational state of the replaced RP can be determined by the LED status on the
RP. Additional information can be attained from the WebGUI status screens.
1 Connect the Ethernet cable to the MGMT port on the BC’s front panel.